Worked example · Lee · legacy IEEE 1584

13.8 kV backup clearing screen

Preliminary incident energy, thermal boundary and clearing-time sensitivity for three-phase AC equipment.

A delayed backup clears an MV switchgear fault after the primary device fails. This scenario explores a high-energy upper-duty case.

Dangerous · over 40 cal/cm²

Preliminary estimate at the working position. PPE category requires the separate NFPA 70E table method.

Incident energy
295.18 J/cm²
Arc-flash boundary
60,167 mm
Time to boundary level
0.025514 s
Working distance
914 mm

Inputs

Fault and equipment
kV
kA
mm
Exposure
s
mm

Exposure plan & energy bands

Live schematic
Arc energy295.2 J/cm²Boundary60,170 mmTime to 1.20.02551 sWorking dist.914 mmEXPOSURE RINGS · PLANEquipment envelopeWorking distance914 mmArc-flash boundary60,170 mmDistance rings · relative scaleTHERMAL ENERGY SCALEThermal boundary level5.021 J/cm²Incident energy295.2 J/cm²High-energy reference167.4 J/cm²Reference energy bands · PPE tables separateIncident energy / thermal level5,879%
The circles are relative distance guides. The energy scale uses screening thresholds of 1.2, 4, 8, 25 and 40 cal/cm².

Derived values & comparisons
Energy in both systems70.55 cal/cm² / 295.18 J/cm²
Reference energy bracketDangerous · > 40 cal/cm²
NFPA 70E PPE categorySeparate equipment tables
Boundary reference5.021 J/cm²
Clearing ceiling at 8 cal/cm²0.17009 s
Clearing ceiling at 40 cal/cm²0.85047 s
Legacy arcing current33.25 kA
Distance exponent0.973

Screening scope. Preliminary screening only. Use an IEEE 1584-2018 study, actual protective-device coordination and a qualified NFPA 70E assessment for equipment labeling, PPE or energized-work decisions.

Try this. Compare 1.5 s backup dwell with 0.15 s primary clearing and examine the time-to-40 threshold.

Calculation method

Lee (1982), DOI 10.1109/TIA.1982.4504068, and IEEE Std 1584-2002 Eq. 7 give the open-air screen E = 2.142 × 10⁶ VIbf t/D² in J/cm² for V in kV, Ibf in kA and D in mm.

The enclosed screen uses IEEE Std 1584-2002 equations 1–6 and Table 4. It estimates arcing current, then applies gap and grounding to normalized energy, with distance exponents 1.641 for LV panels/MCC, 1.473 for LV switchgear and 0.973 for MV switchgear. Clearing time is entered by the user. It can change sharply at reduced arcing current.

The boundary solves for 1.2 cal/cm² (5.0208 J/cm²) with clearing time and other inputs held constant. Clearing-time targets use the same model and geometry. Four reference energy ceilings (4, 8, 25 and 40 cal/cm²) help read the energy scale. NFPA 70E assigns PPE categories through the separate equipment-table method.

IEEE 1584-2018 supersedes the 2002 model and accounts for electrode orientation, enclosure dimensions, arcing-current variation and other effects absent from this worksheet. Even an estimate below 1.2 cal/cm² leaves electrical shock and other hazards to assess.

Standards and model assumptions