13.8 kV backup clearing screen
A delayed backup clears an MV switchgear fault after the primary device fails. This scenario explores a high-energy upper-duty case.
Dangerous · over 40 cal/cm². Preliminary estimate at the working position. PPE category requires the separate NFPA 70E table method.
- Incident energy
- 295.18 J/cm²
- Arc-flash boundary
- 60,167 mm
- Time to boundary level
- 0.025514 s
- Working distance
- 914 mm
Inputs
| Equipment model | MV switchgear · legacy 1584 |
|---|---|
| System line-to-line voltage | 13.8 kV |
| Three-phase bolted fault current | 35 kA |
| Electrode gap | 152 mm |
| System grounding | Solidly grounded |
| Arc clearing time | 1.5 s |
| Working distance from arc | 914 mm |
Derived values
| Energy in both systems | 70.55 cal/cm² / 295.18 J/cm² |
|---|---|
| Reference energy bracket | Dangerous · > 40 cal/cm² |
| NFPA 70E PPE category | Separate equipment tables |
| Boundary reference | 5.021 J/cm² |
| Clearing ceiling at 8 cal/cm² | 0.17009 s |
| Clearing ceiling at 40 cal/cm² | 0.85047 s |
| Legacy arcing current | 33.25 kA |
| Distance exponent | 0.973 |
Preliminary screening only. Use an IEEE 1584-2018 study, actual protective-device coordination and a qualified NFPA 70E assessment for equipment labeling, PPE or energized-work decisions.