Closed wing and three-par linen

A property temporarily has 64 rooms in service. Laundry circulates through its smaller active stock while staff complete 15 checkouts and 18 stayover services.

Attendants to schedule
3
Minutes per allocated room
22.55 min
Daily dry laundry
71.18 lb

Scenario inputs

Changing units converts the weights.
Rooms and cleaning standards
min
min
Productive shift and inspections
hr
Exclude breaks and time unavailable for cleaning.
Linen stock and laundry
lb
lb
%

Results

Shift workload & linen stock

Cleaning minutes and stock pieces use separate scales. Daily laundry uses the selected weight unit.

Housekeeping cleaning workload and linen par stock Cleaning workload · minutesCheckouts · 420 min Checkouts420Stayovers · 324 min Stayovers324Linen par stock · piecesSheets · 384 Sheets384Towels · 576 Towels576Daily laundry71.18 lb

Select a chart mark to read its value.

Rooms allocated to clean
33
Checkout cleaning minutes
420 min
Stayover cleaning minutes
324 min
Total cleaning minutes
744 min
Productive shift equivalents
2.07 FTE
Supervisors or inspectors
1
Sheets in par stock
384
Towels in par stock
576
Full linen set equivalents
19.5
Sheets to wash per day
39
Towels to wash per day
58.5

These hospitality planning estimates model user-entered property and USALI-style parameters for planning only. They are not financial or legal advice.

Worked calculation

How does reopening the wing change stock before workload increases?

Changing rooms in service changes par inventory immediately. Cleaning minutes and daily laundry depend on the separate checkout and stayover counts.

Formulas & conventions

Minutes and MPA
Total minutes = checkouts × minutes per checkout + stayovers × minutes per stayover. MPA = total minutes ÷ (checkouts + stayovers).
Coverage
Productive shift equivalents = total minutes ÷ (productive hours × 60). Attendants = shift equivalents rounded up. Supervisors = attendants ÷ attendants per supervisor, rounded up.
Inventory
Sheets or towels in par stock = rooms in service × pieces per room set × par level. One par represents enough pieces to outfit every room once.
Laundry
Full set equivalents = checkouts + stayovers × full-change rate. Multiply by sheets and towels per set and their dry piece weights. The international pound is exactly 0.45359237 kg.

Use one housekeeping productivity standard per room type and one planned service per physical room that day. Shift equivalents measure the modeled day’s workload. Weekly schedules also need days off, leave and other duties.

Read the methodology and references

More worked examples

  • Airport hotel Sunday turnover

    A 160-room airport property has 82 checkouts and 37 stayovers to clean. The supervisor staffs against productive shift hours after briefings and breaks.

  • Resort changeover day

    A resort has 116 checkouts on changeover day. It budgets long checkout cleans and a five-par stock for rooms with larger towel sets.

  • Extended-stay midweek housekeeping

    An extended-stay hotel has many stayovers and few checkouts. Only 20% of serviced stayovers receive a complete change of towels and sheets.

  • Contract laundry weight in kilograms

    A city property sends laundry to a vendor that quotes dry kilograms. Its housekeeping team logs 70 checkouts, 40 stayovers and a full linen change for half of the stayovers.

  • Empty housekeeping assignment

    An open hotel has no scheduled checkout or stayover service for this shift. It still maintains par stock across its 72 rooms.