Extended-stay midweek housekeeping

An extended-stay hotel has many stayovers and few checkouts. Only 20% of serviced stayovers receive a complete change of towels and sheets.

Attendants to schedule
4
Minutes per allocated room
19 min
Daily dry laundry
122.2 lb

Scenario inputs

Changing units converts the weights.
Rooms and cleaning standards
min
min
Productive shift and inspections
hr
Exclude breaks and time unavailable for cleaning.
Linen stock and laundry
lb
lb
%

Results

Shift workload & linen stock

Cleaning minutes and stock pieces use separate scales. Daily laundry uses the selected weight unit.

Housekeeping cleaning workload and linen par stock Cleaning workload · minutesCheckouts · 507 min Checkouts507Stayovers · 975 min Stayovers975Linen par stock · piecesSheets · 660 Sheets660Towels · 1,320 Towels1.3KDaily laundry122.2 lb

Select a chart mark to read its value.

Rooms allocated to clean
78
Checkout cleaning minutes
507 min
Stayover cleaning minutes
975 min
Total cleaning minutes
1,482 min
Productive shift equivalents
3.95 FTE
Supervisors or inspectors
1
Sheets in par stock
660
Towels in par stock
1,320
Full linen set equivalents
26
Sheets to wash per day
52
Towels to wash per day
104

These hospitality planning estimates model user-entered property and USALI-style parameters for planning only. They are not financial or legal advice.

Worked calculation

How many full linen sets are washed on this midweek shift?

Thirteen checkouts and 20% of 65 stayovers generate 26 full sets, or 52 sheets and 104 towels.

Formulas & conventions

Minutes and MPA
Total minutes = checkouts × minutes per checkout + stayovers × minutes per stayover. MPA = total minutes ÷ (checkouts + stayovers).
Coverage
Productive shift equivalents = total minutes ÷ (productive hours × 60). Attendants = shift equivalents rounded up. Supervisors = attendants ÷ attendants per supervisor, rounded up.
Inventory
Sheets or towels in par stock = rooms in service × pieces per room set × par level. One par represents enough pieces to outfit every room once.
Laundry
Full set equivalents = checkouts + stayovers × full-change rate. Multiply by sheets and towels per set and their dry piece weights. The international pound is exactly 0.45359237 kg.

Use one housekeeping productivity standard per room type and one planned service per physical room that day. Shift equivalents measure the modeled day’s workload. Weekly schedules also need days off, leave and other duties.

Read the methodology and references

More worked examples

  • Airport hotel Sunday turnover

    A 160-room airport property has 82 checkouts and 37 stayovers to clean. The supervisor staffs against productive shift hours after briefings and breaks.

  • Resort changeover day

    A resort has 116 checkouts on changeover day. It budgets long checkout cleans and a five-par stock for rooms with larger towel sets.

  • Contract laundry weight in kilograms

    A city property sends laundry to a vendor that quotes dry kilograms. Its housekeeping team logs 70 checkouts, 40 stayovers and a full linen change for half of the stayovers.

  • Closed wing and three-par linen

    A property temporarily has 64 rooms in service. Laundry circulates through its smaller active stock while staff complete 15 checkouts and 18 stayover services.

  • Empty housekeeping assignment

    An open hotel has no scheduled checkout or stayover service for this shift. It still maintains par stock across its 72 rooms.