Worksheet guide
From survey to screening
Set up the input datums, interpret the readout, and save a reproducible calculation.
Set the datum first
Measure channel depths from the invert at the same station. For weirs measure head from the crest or notch apex. A Parshall installation uses its prescribed Hₐ and Hᵦ taps. For a dam, enter pool and silt depths from the base and a monolith strip width for force totals.
Check the units and decimal slope. A slope of 0.16% is entered as 0.0016. If an example starts in US units, SI shows the same physical values.
Locate the control
Compare normal depth and critical depth before tracing a backwater profile. Use the known controlling depth at station zero and read the sign of the target station. A negative station lies upstream.
Use the jump worksheet where a rectangular flow changes rapidly from supercritical to subcritical. Confirm basin tailwater over the operating flow range.
Read the status and geometry together
Blue marks water surfaces and steady hydraulic results. Teal identifies screening windows such as a dam’s middle third. Red calls attention to supercritical jumps, pressure, exit-gradient, or scour checks.
Use the numeric table and notes alongside the SVG. Schematics emphasize relationships and some geometry is vertically exaggerated.
Record the worksheet
Share link preserves the current inputs and unit system. A file link restores state in the same local copy. Reset reloads the page’s preset.
Use JSON for a complete worksheet, CSV for tabular inputs and station schedules, and SVG or PNG for the live figure. The Print action creates an A4 calculation sheet.
Check the site beyond the model
Approach flow, tailwater, roughness, drawdown, foundation conditions, erosion and debris can change the controlling result. Compare the formula assumptions to the design case and use the applicable project criteria.
Each calculator links to its equation references and related worked examples.