Injection molding clamp tonnage calculator

Size press clamping force from projected part and runner area, cavity pressure and a safety factor.

Edit inputs ↓

Inputs

cm²
cm²
Total for one shot, including the projected feed system.
MPa
×
Range 1.10–1.25.
metric t
Clamp force
43.66metric t
Projected area
120cm²
Press use
85.6%
Clamp reserve
7.33metric t

Projected area at the parting plane

Live schematic
4 × CAVITIES31 MPaArea 120 cm²Runner 8 cm²

Within press rating

0%100% rating125%+

Includes the entered safety factor. The rating boundary is 100% utilization.

Calculation details
Required clamp force428.16 kN
Required clamp force48.13 US tons
Required clamp force43.66 metric t
Installed press rating50.99 metric t
Cavity pressure31.03 MPa
Reserve of installed rating14.4%

Model and assumptions

A_proj = N × A_part + A_runner. F_required (kN) = 0.1 × A_proj (cm²) × P_cavity (MPa) × SF.

Use the silhouette in the clamp direction, including the projected feed system. Enter mean cavity pressure at the limiting fill or packing condition. The pressure tiers are starting estimates. Use a measured or simulated cavity pressure for press selection when available. The utilization boundary compares the calculated force with the entered rating.

Methodology and sources