ACI 318-19 §16.3 / §21.2 / §22.8

Concrete Pedestal Bearing & Dowels Calculator

Check concrete bearing at a centered loaded area, 1V:2H support confinement and minimum steel across a cast-in-place interface.

Edit inputs ↓

Inputs

Centered bearing · rectangular projection

Contact & support
Interface steel
φBn 636.48kip
Area A₂ 576in²
Confinement 2 
Excess Pu 0kip
AnatomyDiagrammatic scale
Parameter-linked bearing drawing. Diagrammatic scale. SUPPORT SECTIONPROJECTED PLAN1V : 2H projectionA₁ 144 in²A₂ 576 in²× 2

Screening

Within screening limits
Bearing utilization78.6%
Confined bearing21.4% below the threshold
  • Projection geometryA₂ fits within the 1V:2H envelope
    Within limit
  • Concrete bearing strengthPu ≤ φBn
    Within limit
  • Interface reinforcementDowel or continuous steel area ≥ 0.005Ag
    Within limit

Concentric compression on a rectangular support with uniform depth. Check the loaded member side, eccentricity, punching, dowel development, shear friction and actual reinforcement load transfer separately.

Calculation readout
QuantityValue
Design bearing φBn636.48 kip
Supporting area A₂ used576 in²
Confinement multiplier2
Demand beyond concrete bearing0 kip
Loaded area A₁144 in²
Maximum projected area A₂576 in²
Permitted side projection6 in
Nominal bearing Bn979.2 kip
Supported gross area Ag144 in²
Minimum interface steel0.72 in²
Provided interface steel1.24 in²

How the check works

Code basis ↗
  1. Take A₁ as loaded width × length. At 1V:2H the uniform side projection is limited by 2 × depth and the nearest support edge. The resulting footprint bounds A₂.
  2. Use φBn = 0.65 × 0.85f′c A₁ × min(√(A₂/A₁), 2). Confinement requires support beyond all loaded edges. Report any Pu above φBn as force requiring a separately designed transfer path.
  3. For a cast-in-place column or pedestal to foundation, compare the provided interface steel with 0.005 times supported gross area. A₁ is the default when it represents the gross area of the supported member.