Worked example
A concrete console top with two round cutouts
Account for two 4.5 cm openings in a console slab and compare material quantities before and after displacement.
Edit example inputs
View resultsCasting volume and ingredients
- Outside volume
- 7.09 L0.2503 ft³
- Total displaced volume
- 0.07952 L0.002808 ft³
- Volume in finished casting
- 7.01 L0.2475 ft³
- Volume to mix with allowance
- 7.57 L0.2673 ft³
- Estimated cured mass
- 15.98 kg35.23 lb
- Estimated fresh mix mass
- 17.63 kg38.88 lb
- Portland cement
- 2.75 kg6.07 lb
- Sand
- 5.5 kg12.13 lb
- Coarse aggregate
- 8.25 kg18.2 lb
- Iron oxide pigment
- 0.08253 kg0.182 lb
- Mixing water
- 1.05 L0.2762 US gal
- Cured weight is an estimate from the finished volume. Check actual material yield and use the supplier SDS for cement and silica dust.
Worksheet inputs
- Casting shape
- Rectangular slab
- Slab length
- 105 cm
- Slab width
- 27 cm
- Overall thickness or height
- 2.5 cm
- Extra identical cutouts
- 2
- Extra cutout shape
- Circular
- Cutout diameter
- 4.5 cm
- Cutout depth
- 2.5 cm
- Mixing and waste allowance
- 8%
- Mix type
- 1:2:3 cement, sand, aggregate by weight
- Fresh mix density
- 2.33 kg/L
- Estimated cured density
- 2.28 kg/L
- Water-to-cementitious mass ratio
- 0.38 : 1
- Iron oxide per weight of Portland cement
- 3%
Work through this example
Each circular insert displaces about 39.76 mL. Two inserts remove about 79.52 mL before applying the allowance.
Mix volume = (outside volume − recesses and cutouts) × (1 + waste fraction)The 1:2:3 option uses one part cement, two sand and three aggregate by weight. GFRC uses a simplified 1:1 sand-to-binder estimate with fiber by fresh mass and a selectable pozzolan share. Model water and pigment by mass, then convert water to volume at 1 kg/L. Use a qualified recipe and measured yield for a pour.
Common questions
How should I enter one large and one small console opening?
Calculate their individual displaced volumes separately. The duplicate cutout control assumes the same diameter and depth for every cutout.
Does the slab sketch show where to place the two holes?
The cross-section illustrates their combined effect. Plan positions, reinforcement and edge distances separately for the actual mold.