868 MHz Fresnel Clearance for a 2 km Rooftop Link

Check 868 MHz Fresnel clearance over 2 km with unequal rooftop elevations and an obstruction 65% of the way to the receiver.

Jump to results ↓

Inputs

Path & clearance
Standard planning value is 4/3.
Terrain & antenna heights
Use the same elevation reference at both ends.
Subtract interpolated ground elevation from the top of the ridge or canopy.

Results

Preset estimate
Midpoint first-zone radius 13.14m

Clearance target missed

Worst clearance surplus
-2.63 m
Midpoint Earth bulge
0.06 m
First Fresnel zone and curved terrain profileTXRX2 km
Dashed copper shows the 60% clearance boundary. Pale shading shows the complete first zone. Vertical scale is exaggerated.

Obstacle & limiting point

Obstacle distance from TX
1.3 km
First-zone radius at obstacle
12.54 m
Earth bulge at obstacle
0.05 m
Direct-ray clearance at obstacle
4.9 m
60% radius at obstacle
7.52 m
Worst clearance point from TX
1.3 km

Mast heights above local ground

Raise both masts by
2.63 m
TX height when both are raised
11.63 m
RX height when both are raised
14.63 m
TX height with RX fixed
16.5 m
RX height with TX fixed
16.04 m

Worked example

Enter the two site elevations relative to the same datum, then add the support height above those elevations. At 65% of this path, interpolated ground is 26.45 m. An obstruction 6 m higher puts its top at 32.45 m before the curvature term.

A receive-side rise has more leverage at this obstacle than an equal rise at the transmitter. Use the full-path clearance result as well, since a different point can become limiting after changing the masts.

Midpoint first-zone radius
13.14 m
Worst clearance surplus
-2.63 m
Midpoint Earth bulge
0.06 m

Formulas & assumptions

  • F₁ = √(λ d₁d₂ / (d₁ + d₂)). Use meters throughout and λ = c/f.
  • Earth bulge = d₁d₂ / (2kR), where R = 6,371,000 m. At the midpoint, bulge grows with the square of total distance.
  • Surplus = antenna-to-antenna line height − curved terrain height − selected fraction × F₁. The model checks the smooth path and the entered obstacle.
  • Raising both endpoints by X lifts the entire ray by X. Raising TX alone by X lifts the ray by (1 − fraction along path) × X.

Ground is interpolated in a straight line between the endpoint elevations, with one added obstacle and effective-Earth curvature. Enter the tallest relevant ridge or canopy and repeat for other obstructions.

60% is a common planning check. Refraction, weather and clearance objectives can require a different k or zone fraction. The cross-section uses a separate vertical scale.

References

Questions & answers

How do unequal rooftop heights affect the 868 MHz clearance ray?

The ray joins the two antenna tips and slopes toward the higher end. The obstruction is compared with the ray height at its own location.

Why does my obstacle height field use interpolated terrain?

The base model draws a straight profile between the endpoint elevations. Add the difference from that baseline to the top of the obstruction.