Cylindrical roller bearing on a mill shaft
A locating arrangement takes thrust elsewhere. The cylindrical roller bearing carries the 14 kN radial reaction at 620 RPM.
Live results
Bearing load path- Dynamic load
- 14,000N
- L10
- 1,151.1million rev
- L10h
- 30,943h
- Modified life
- 11,913h
Service-life target
ReviewCalculated modified life falls below the entered service-hours target.
Editable case inputs
Calculation details
| Life exponent p | 3.33333 |
|---|---|
| Reliability factor a₁ | 0.55 |
| Radial contribution X·Fr | 14,000 N |
| Axial contribution Y·Fa | 0 N |
| Modified-life target | 30,000 h |
| Hours above or below target | -18,087.1 h |
What to check
Use the roller exponent 10/3 and a radial-only load path. Increasing C changes revolutions to failure by that exponent.
Model & assumptions
Use catalog C, X and Y for the exact bearing and load arrangement. L10 is a population fatigue-life statistic at 90% reliability. Modified life uses the entered aISO. The service-hours target is a planning input.
Check minimum load, static capacity, lubrication, allowable speed and application limits separately. The 91–94% factors are interpolated between the ISO 281 values at 90% and 95%.
Methodology and references ↗RotorVibLab · SI · Engineering calculation
Cylindrical roller bearing on a mill shaft
P = X·Fr + Y·Fa · L10 = (C/P)ᵖ · Lnmh = a₁·aISO·L10h
Operating inputs
| Bearing element | Cylindrical / spherical roller |
|---|---|
| Running speed | 620 RPM |
| Dynamic rating C | 116,000 N |
| Service-hours target | 30,000 h |
| Radial load Fr | 14,000 N |
| Axial load Fa | 0 N |
| Radial factor X | 1 |
| Axial factor Y | 0 |
| Reliability | 96% |
| Operating factor aISO | 0.7 |
Results
| Dynamic load | 14,000 N |
|---|---|
| L10 | 1,151.06 million rev |
| L10h | 30,942.6 h |
| Modified life | 11,912.9 h |
| Life exponent p | 3.33333 |
| Reliability factor a₁ | 0.55 |
| Radial contribution X·Fr | 14,000 N |
| Axial contribution Y·Fa | 0 N |
| Modified-life target | 30,000 h |
| Hours above or below target | -18,087.1 h |
Service-life target. Calculated modified life falls below the entered service-hours target.