Worked example

Twin LP85 Reserve from a 38 m Wreck Deck

Manifolded LP85s are used as the supply in a technical training example. The worksheet models an unobstructed ascent starting at 38 m outside the wreck.

Inputs

bar
bar
m
L/min
Two divers at the same entered rate.

Results

Live calculation
  • The two-diver ascent requires more gas than the other reserve floors. It raises the effective reserve.
Adjusted turn pressure
120bar
Rounded up in the selected units.
Starting free gas
4,628.2L
Gas above effective reserve
2,910.8L
Two-diver ascent gas
1,717.4L
Rock-bottom pressure
65bar
Rounded up in the selected units.
Effective reserve floor
65bar
Rounded up in the selected units.
Turn rule before reserve check
117bar
Cylinder pressure zonesStart 175 bar, effective reserve 65 bar. Cylinder pressure zones120 barADJUSTED TURN0179 bar● RESERVE● ROCK BOTTOM● START65 bar65 bar175 bar

Work through this example

A deeper ascent adds time at higher ambient pressure. The same stressed surface rate therefore draws more free gas than at a shallow wreck site.

Try it. Compare the ascent reserve with an otherwise identical ascent starting at 28 m.

How the calculation works

Model an open-water ascent

Two divers each breathe the entered stressed RMV. Budget one minute at depth, then ascend at 9 m/min with a modeled three-minute pause at 5 m when the starting depth is at least 5 m. Each ascent leg uses the average pressure of its endpoints. Verify a complete team plan for the actual profile and any overhead or decompression.

Protect the effective reserve

Take the highest of the chosen floor, ascent gas in gauge pressure, and one-third of start for thirds. The turn is the higher of the rule baseline (two-thirds of start or half + 200 psi) and halfway between start and the effective floor. Free gas scales linearly with cylinder pressure.

References

Questions & answers

Where does the 38 m LP85 example begin its ascent calculation?

At the entered open-water depth outside the wreck. Gas for leaving an overhead and any required decompression are separate planning needs.

Why is the stressed RMV 40 L/min in the twin LP85 example?

It is an editable teaching assumption for each diver in this comparison. Teams need values and procedures suited to their training and conditions.