How the calculation works
Read this example
Review the position of support lines or an appropriate engineered diaphragm model before detailing collectors.
Preset result: UNIT SHEAR 610.435 plf.
Find the support and chord forces
Uniform line load gives V = wL/2 and M = wL²/8. The peak diaphragm unit shear is V/B. Treat the tension and compression chords as a force couple separated by B, giving M/B in each chord.
Follow the shear across wall openings
A gap interrupts the uniform transfer line. The transferred drag across an isolated opening is unit shear times its length. The profile resets at the next pier in this model.
Read the aspect ratio as a screen
L/B is compared with 3:1 and 4:1 for early layout review. The actual permitted ratio depends on the chosen system and applicable material standard.
Design scope
Provide the governing design line load. Check collector continuity, overstrength, pier capacity, material limits, flexible or rigid distribution, and force transfer around openings separately.
Source references
- ASCE/SEI 7-16 standardhttps://ascelibrary.org/doi/book/10.1061/9780784414248
- FEMA P-1051 design exampleshttps://www.fema.gov/sites/default/files/2020-07/fema_nehrp-seismic-provisions-examples_p-1051_20160701.pdf