Warehouse shipping API over 28 days
A warehouse labels API uses a 99.5% objective across four 7-day shifts. It lost 100 minutes to a dependency outage during the most recent reporting window.
Jump to resultsInputs
Results
Runs in your browser- Remaining budget
- 101.6min
- Allowed downtime
- 201.6min
- Time to exhaustion
- 50,800min At the recent measured rate
The exhaustion estimate uses the last five minutes of errors.
| Observed uptime | 99.752 % |
|---|---|
| Budget used | 49.603 % |
| Current burn rate | 0.4 × |
| Reporting window burn | 0.496 × |
| 1 h burn at 14.4× threshold | 0.7 × |
| 5 min burn for 1 h / 5 min | 0.4 × |
| Page for 1 h / 5 min | Below threshold |
| 6 h burn at 6× threshold | 0.5 × |
| 30 min burn for 6 h / 30 min | 0.6 × |
| Page for 6 h / 30 min | Below threshold |
| 3 days burn at 1× threshold | 0.28 × |
| 6 h burn for 3 days / 6 h | 0.5 × |
| Ticket for 3 days / 6 h | Below threshold |
What to try
Switch the readout to hours to compare the remaining allowance with the dependency’s on-call recovery time. If the objective only covers staffed shifts, model those service hours separately.
How the estimate works
Error budget = (1 − SLO) × window size
A time-based budget is the outage allowance over the full reporting window. A request-based budget is the maximum whole number of eligible requests that can fail while meeting the objective.
Burn rate is the observed error rate divided by the allowed error rate. Each alert requires both windows to meet the threshold. The same 14.4×, 6×, and 1× thresholds are offered for all windows. Their budget fractions were originally set for a 30-day SLO.
Time to exhaustion projects the last five minutes of burn, or uses your full-window average when that reading is blank. For request-based objectives it assumes the reporting window’s average request volume continues.
Frequently asked questions
Does the 28-day shipping API window exclude weekends?
The calculation uses 28 full calendar days. A business-hours objective needs an eligible-time window that matches your service agreement.
Can dependency failures be excluded from a shipping reliability objective?
Include the user-facing impact unless the published objective explicitly excludes it. Track dependency attribution separately for incident review.