Chamber pump-down time / Worked example

Roots-Boosted Coating Vessel

A 3.2 m³ coating vessel uses 65 L/s backing-only speed with a 240 L/s combined speed below 800 Pa.

Readout ↓

Inputs

Chamber and effective speeds
L
Pa
Pa
Pa
L/s
L/s
Roots booster
Pa
L/s
Walls, seals and leaks
m²
Pa·m³/(s·m²)
s
Age at the start of the high-vacuum stage.
Pa·m³/(s·m²)
Pa·m³/s

Live readout

Target vacuum met
Roughing time299.8sHigh-vac time321.2sTotal time621sUltimate floor6.765e-8PaS₁Backing238 sS₂Roots stage61.4 sS₃High vacuum321 sLog P · Pa vs log-spaced time (s)6.76e-80.08281.01e5054727Roots cut-in800 PaTarget P4e-4 PaFloor P6.76e-8 Pa
Roughing time
299.8 s
Backing-only roughing time
238.3 s
Boosted roughing time
61.4 s
High-vacuum stage
321.2 s
Time to target
621 s
Modeled ultimate pressure
6.765e-8 Pa
Wall throughput at target
2.701e-4 Pa·m³/s

    Reading this example

    The change in log-pressure slope shows where the booster saves time. Use the vendor cut-in pressure as the operating constraint.

    Model & assumptions

    Roughing stages

    t = (V/S) ln(Pₐ/Pᵦ)

    The backing pump runs above the Roots switch pressure. Use combined speed below the switch, until the high-vacuum pump takes over. Enter chamber-effective speeds for all stages.

    High-vacuum mass balance

    V dP/dt = A[q∞ + q₁(1 + t/t₁)⁻ᵅ] + Qₗ − SₑP

    The high-vacuum clock starts with wall age t₁. The solver integrates the decaying load with exponential chamber memory until pressure crosses the target. At α = 0 the reference wall rate is a steady load.

    Ultimate pressure

    P∞ = (Aq∞ + Qₗ)/Sₑ (α > 0)

    The model rejects a target at or below the ultimate pressure. With a decaying wall load, a target can sit above the floor and still take longer than the 10¹² s search horizon.