The mill cut removes existing HMA credit. Required overlay depth is measured from the milled surface.
RAP target supplied on site
Marker compares recovered RAP mass with target RAP demand.
Calculation ledger
Structural number to add
1.632
Pre-mill effective SN
3.94
Retained HMA thickness
5 in
New compacted overlay HMA
2,952.7 US tons
RAP to meet target blend
738.2 US tons
RAP stock surplus / shortfall
834.3 US tons
On-site RAP in new mix
25%
Virgin binder with on-site stock only
122.54 US tons
Binder savings with full target RAP
36.91 US tons
Inputs
Changes update results
How the calculation works
Deduct the milled depth from existing HMA and credit the retained layers.
Convert any structural number deficit to a net overlay thickness.
Compare RAP supply and blend demand, then credit available RAP binder against virgin binder.
The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.
RAP target supplied on site. Marker compares recovered RAP mass with target RAP demand.
Inputs
Future required SN
5
New HMA coefficient aₒₗ
0.44
Cold-mill removal depth
2 in
Rehabilitation area
14,000 yd²
Existing HMA depth
7 in
Intact HMA coefficient
0.44
Retained HMA condition
65%
Existing HMA bulk SG
2.4
Base depth
10 in
Base coefficient
0.14
Retained base condition
85%
Subbase depth
8 in
Subbase coefficient
0.11
Retained subbase condition
85%
New HMA bulk SG
2.43
Target RAP by mix mass
25%
Binder in milled RAP
5%
Total new mix binder
5.4%
RAP binder availability
100%
Results
Post-mill effective SN
3.368
Net overlay from milled surface
3.71 in
Recovered milled RAP
1,572.5 US tons
On-site virgin binder savings
36.91 US tons
Structural number to add
1.632
Pre-mill effective SN
3.94
Retained HMA thickness
5 in
New compacted overlay HMA
2,952.7 US tons
RAP to meet target blend
738.2 US tons
RAP stock surplus / shortfall
834.3 US tons
On-site RAP in new mix
25%
Virgin binder with on-site stock only
122.54 US tons
Binder savings with full target RAP
36.91 US tons
The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.