The mill cut removes existing HMA credit. Required overlay depth is measured from the milled surface.
RAP target supplied on site
Marker compares recovered RAP mass with target RAP demand.
Calculation ledger
Structural number to add
2.666
Pre-mill effective SN
3.07
Retained HMA thickness
0.5 in
New compacted overlay HMA
4,823.3 US tons
RAP to meet target blend
1,447 US tons
RAP stock surplus / shortfall
2,484.2 US tons
On-site RAP in new mix
30%
Virgin binder with on-site stock only
191 US tons
Binder savings with full target RAP
69.46 US tons
Inputs
Changes update results
Work through this example
Deduct the milled depth from existing HMA and credit the retained layers.
Convert any structural number deficit to a net overlay thickness.
Compare RAP supply and blend demand, then credit available RAP binder against virgin binder.
Watch the retained HMA shrink as the mill approaches the full asphalt thickness.
The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.
Asphalt Overlay Thickness & RAP · US customary units
RAP target supplied on site. Marker compares recovered RAP mass with target RAP demand.
Inputs
Future required SN
4.9
New HMA coefficient aₒₗ
0.44
Cold-mill removal depth
5 in
Rehabilitation area
14,000 yd²
Existing HMA depth
5.5 in
Intact HMA coefficient
0.44
Retained HMA condition
38%
Existing HMA bulk SG
2.4
Base depth
11 in
Base coefficient
0.14
Retained base condition
85%
Subbase depth
9 in
Subbase coefficient
0.11
Retained subbase condition
85%
New HMA bulk SG
2.43
Target RAP by mix mass
30%
Binder in milled RAP
4.8%
Total new mix binder
5.4%
RAP binder availability
100%
Results
Post-mill effective SN
2.234
Net overlay from milled surface
6.06 in
Recovered milled RAP
3,931.2 US tons
On-site virgin binder savings
69.46 US tons
Structural number to add
2.666
Pre-mill effective SN
3.07
Retained HMA thickness
0.5 in
New compacted overlay HMA
4,823.3 US tons
RAP to meet target blend
1,447 US tons
RAP stock surplus / shortfall
2,484.2 US tons
On-site RAP in new mix
30%
Virgin binder with on-site stock only
191 US tons
Binder savings with full target RAP
69.46 US tons
The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.