Adequate structure after spot milling

Check a section where retained SN is already above the future structural requirement.

Design readout

Effective SN
4.677
Overlay lift
0
in
Milled RAP
176.9
US tons
Binder saved
0
US tons

Cold-mill and overlay depth section

Cold-mill and overlay depth sectionREHABILITATION SECTIONPOST-MILL DATUMEXISTINGREHABILITATEDMILL CUT0.75 inRETAINED HMA7.5 inNEW HMA LIFT0 in
The mill cut removes existing HMA credit. Required overlay depth is measured from the milled surface.

No RAP blend demand

Marker compares recovered RAP mass with target RAP demand.

Calculation ledger
Structural number to add
0
Pre-mill effective SN
4.951
Retained HMA thickness
7.5 in
New compacted overlay HMA
0 US tons
RAP to meet target blend
0 US tons
RAP stock surplus / shortfall
176.9 US tons
On-site RAP in new mix
0%
Virgin binder with on-site stock only
0 US tons
Binder savings with full target RAP
0 US tons

Inputs

Changes update results

Structure and mill depth
in
yd²
Existing asphalt
in
%
Existing granular support
in
%
in
%
New blend mass balance
%
%
%
%

Condition percentages multiply the intact layer coefficients. Set them using field condition and agency guidance.

Work through this example

  1. Deduct the milled depth from existing HMA and credit the retained layers.
  2. Convert any structural number deficit to a net overlay thickness.
  3. Compare RAP supply and blend demand, then credit available RAP binder against virgin binder.

Structural lift and RAP blend demand are zero. A practical wearing course may still be specified.

The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.

Read the equations and sources