Partial RAP binder availability

Estimate a blend where only a fraction of the reclaimed binder is assumed available.

Design readout

Effective SN
3.44
Overlay lift
3.55
in
Milled RAP
2,162.2
US tons
Binder saved
35.42
US tons

Cold-mill and overlay depth section

Cold-mill and overlay depth sectionREHABILITATION SECTIONPOST-MILL DATUMEXISTINGREHABILITATEDMILL CUT2.75 inRETAINED HMA5.25 inNEW HMA LIFT3.55 in
The mill cut removes existing HMA credit. Required overlay depth is measured from the milled surface.

RAP target supplied on site

Marker compares recovered RAP mass with target RAP demand.

Calculation ledger
Structural number to add
1.56
Pre-mill effective SN
4.226
Retained HMA thickness
5.25 in
New compacted overlay HMA
2,823.3 US tons
RAP to meet target blend
903.5 US tons
RAP stock surplus / shortfall
1,258.7 US tons
On-site RAP in new mix
32%
Virgin binder with on-site stock only
114.22 US tons
Binder savings with full target RAP
35.42 US tons

Inputs

Changes update results

Structure and mill depth
in
yd²
Existing asphalt
in
%
Existing granular support
in
%
in
%
New blend mass balance
%
%
%
%

Condition percentages multiply the intact layer coefficients. Set them using field condition and agency guidance.

Work through this example

  1. Deduct the milled depth from existing HMA and credit the retained layers.
  2. Convert any structural number deficit to a net overlay thickness.
  3. Compare RAP supply and blend demand, then credit available RAP binder against virgin binder.

Set binder availability to 100% to isolate the mass-balance effect without altering the stockpile tonnage.

The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.

Read the equations and sources