Thin mill with RAP stock shortfall

Test a shallow mill against a deep future lift and a high planned RAP share.

Design readout

Effective SN
2.96
Overlay lift
7.36
in
Milled RAP
440.9
US tons
Binder saved
22.04
US tons

Cold-mill and overlay depth section

Cold-mill and overlay depth sectionREHABILITATION SECTIONPOST-MILL DATUMEXISTINGREHABILITATEDMILL CUT0.5 inRETAINED HMA5.5 inNEW HMA LIFT7.36 in
The mill cut removes existing HMA credit. Required overlay depth is measured from the milled surface.

RAP import or blend change needed

Marker compares recovered RAP mass with target RAP demand.

Calculation ledger
Structural number to add
3.24
Pre-mill effective SN
3.065
Retained HMA thickness
5.5 in
New compacted overlay HMA
6,574.6 US tons
RAP to meet target blend
2,301.1 US tons
RAP stock surplus / shortfall
-1,860.2 US tons
On-site RAP in new mix
6.71%
Virgin binder with on-site stock only
332.98 US tons
Binder savings with full target RAP
115.06 US tons

Inputs

Changes update results

Structure and mill depth
in
yd²
Existing asphalt
in
%
Existing granular support
in
%
in
%
New blend mass balance
%
%
%
%

Condition percentages multiply the intact layer coefficients. Set them using field condition and agency guidance.

Work through this example

  1. Deduct the milled depth from existing HMA and credit the retained layers.
  2. Convert any structural number deficit to a net overlay thickness.
  3. Compare RAP supply and blend demand, then credit available RAP binder against virgin binder.

Compare on-site binder savings with the full target RAP savings if stock were imported.

The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.

Read the equations and sources