ASPHALTPAVELAB / PAVEMENT DESIGN WORKSHEET
Two-inch mill and structural lift
Asphalt Overlay Thickness & RAP · US customary units
RAP target supplied on site. Marker compares recovered RAP mass with target RAP demand.
Inputs
| Future required SN | 5.2 |
|---|---|
| New HMA coefficient aₒₗ | 0.44 |
| Cold-mill removal depth | 2 in |
| Rehabilitation area | 12,500 yd² |
| Existing HMA depth | 7.25 in |
| Intact HMA coefficient | 0.44 |
| Retained HMA condition | 64% |
| Existing HMA bulk SG | 2.4 |
| Base depth | 10 in |
| Base coefficient | 0.14 |
| Retained base condition | 85% |
| Subbase depth | 8 in |
| Subbase coefficient | 0.11 |
| Retained subbase condition | 85% |
| New HMA bulk SG | 2.43 |
| Target RAP by mix mass | 22% |
| Binder in milled RAP | 5% |
| Total new mix binder | 5.4% |
| RAP binder availability | 100% |
Results
| Post-mill effective SN | 3.416 |
|---|---|
| Net overlay from milled surface | 4.05 in |
| Recovered milled RAP | 1,404 US tons |
| On-site virgin binder savings | 31.69 US tons |
| Structural number to add | 1.784 |
| Pre-mill effective SN | 3.98 |
| Retained HMA thickness | 5.25 in |
| New compacted overlay HMA | 2,881.2 US tons |
| RAP to meet target blend | 633.9 US tons |
| RAP stock surplus / shortfall | 770.1 US tons |
| On-site RAP in new mix | 22% |
| Virgin binder with on-site stock only | 123.89 US tons |
| Binder savings with full target RAP | 31.69 US tons |
The analytical lift is a structural minimum. Confirm practical lift thickness, mix design, binder blending and stockpile processing losses with project data.