Engineering reference
Methodology
Equations, units and assumptions used in the eight pavement calculators. Results are intended for preliminary screening and verification against project criteria.
Flexible Pavement Structural Number
log₁₀ W₁₈ = Zᵣ S₀ + 9.36 log₁₀(SN + 1) − 0.20 + log₁₀(ΔPSI / 2.7) / [0.40 + 1094 / (SN + 1)⁵·¹⁹] + 2.32 log₁₀(Mᵣ) − 8.07
SN provided = a₁D₁ + a₂D₂m₂ + a₃D₃m₃
The reliability selector uses the rounded standard normal deviates printed in FHWA Table C-3. Enter p₀ and pₜ so the serviceability loss p₀ − pₜ is between 0 and 4.2. Calculations use inches and psi. For very small serviceability loss the equation can change slope twice. The solver finds the thickness requirement that also clears the later minimum.
Rigid JPCP Slab Thickness
log₁₀ W₁₈ = Zᵣ S₀ + 7.35 log₁₀(D + 1) − 0.06 + log₁₀(ΔPSI / 3) / [1 + 1.624 × 10⁷ / (D + 1)⁸·⁴⁶] + (4.22 − 0.32pₜ) log₁₀ F
F = S′c Cᵈ (D⁰·⁷⁵ − 1.132) / {215.63 J [D⁰·⁷⁵ − 18.42 / (E꜀ / k)⁰·²⁵]}
The SHRP transcription supplies 1.624 × 10⁷ in the serviceability term. The solver brackets the root on the increasing design branch with positive numerator and denominator thickness terms. A trial outside that branch has no reported capacity. Structural inputs use inches, psi and pci internally.
ESAL Traffic & Axle Loads
F꜀ = Σᵢ₌₀ⁿ⁻¹ (1 + g)ⁱ = expm1[n log1p(g)] / g when g ≠ 0. For g = 0, F꜀ = n.
W₁₈ = 365 × AADT₀ × truck share × direction share × lane share × F꜀ × truck factor
Year one uses the opening-year AADT. The optional group factor sums the average group counts times (actual group load / nominal group reference)⁴. References are 18 kip single, 34 kip tandem and 48 kip tridem. The common engineering approximation omits pavement-specific AASHTO load equivalency tables.
Superpave HMA Mix Volumetrics
Pₛ = 100 − Pᵦ. Gₛₑ = Pₛ / (100 / Gₘₘ − Pᵦ / Gᵦ).
Vₐ = 100(1 − Gₘᵦ / Gₘₘ). VMA = 100 − GₘᵦPₛ / Gₛᵦ. VFA = 100(VMA − Vₐ) / VMA.
Pᵦₐ = 100Gᵦ(Gₛₑ − Gₛᵦ) / (GₛᵦGₛₑ). Pᵦₑ = Pᵦ − PᵦₐPₛ / 100. Dust ratio = P₀.₀₇₅ / Pᵦₑ.
Pᵦ and Pᵦₑ are percentages of total mix mass. Pᵦₐ and percent passing the No. 200 sieve are percentages of aggregate mass. Minimum VMA is 15, 14, 13 or 12% for 9.5, 12.5, 19 or 25 mm NMAS. VFA bands use design traffic and the 9.5 and 25 mm size exceptions in the FHWA workbook. The display band for design air voids is 3.9–4.1%.
FHWA Background of Superpave, appendix D
Subgrade CBR & Frost Penetration
Mᵣ screen = 2555 × CBR⁰·⁶⁴ psi. Linear E screen = 1500 × CBR psi.
ln k = −2.807 + 0.1253(ln Dₛᵦ)² + 1.062 ln Mᵣ + 0.1282 ln Dₛᵦ ln Eₛᵦ − 0.4114 ln Dₛᵦ − 0.0581 ln Eₛᵦ − 0.1317 ln Dₛᵦ ln Mᵣ.
X Stefan = √(48 kₜ n FI / Lᵥ) ft. X frost = λ × X Stefan. Lᵥ = 144 × γᵈ × w/100 Btu/ft³.
The k equation uses Powell Mᵣ, granular subbase depth in inches and the subbase modulus in psi. With zero granular depth, estimated bare k = Mᵣ/19.4. Figure 5-24 covers 4–20 in of subbase and roadbed moduli of 1–20 ksi. The tool flags subbase modulus outside the FHWA guidance. The frost model assumes one homogeneous equivalent medium. Enter mean thermal conductivity kₜ, the air-to-surface factor n and a site-appropriate Berggren factor λ.
Asphalt Tonnage, Tack & Haul
Density = Gₘᵦ × 62.4 lb/ft³. Net mix = length × width × compacted depth × density.
Spray volume = area × residual rate / (supplied binder fraction × final emulsion fraction).
Truck count = ceiling(hourly paving demand × round-trip hours / payload).
The final emulsion fraction equals one minus the added water fraction of the mixed spray. A 1:1 mix uses 50% added water. The ledger shows a second fleet size using the lower of plant production and theoretical paving demand. For tack quantity, select the receiving surface and enter a contract or trial value.
Westergaard Slab Stress & Curling
ℓ = [E꜀h³ / (12(1 − ν²)k)]¹⁄⁴. a = √(P / πq). b = √(1.6a² + h²) − 0.675h for a < 1.724h, otherwise b = a.
Interior = 0.275(1 + ν) (P/h²) log₁₀(E꜀h³ / kb⁴). Edge = 0.529(1 + 0.54ν) (P/h²) [log₁₀(E꜀h³ / kb⁴) − 0.71].
Corner = 3(P/h²)[1 − (a√2/ℓ)⁰·⁶]. Curl = CₓE꜀α꜀ΔT / 2. Screen ratio = (max wheel stress + |curl|) / Mᵣ.
The finite slab coefficient uses λ = Lₓ/(√8 ℓ) and Bradbury’s centerline expression. Positive ΔT means a warmer surface. The sign is retained in the curl readout. The PCA screen begins at a stress ratio of 0.45 with a second curve branch above 0.55.
Bureau of Public Roads, Arlington slab tests, equations 3–9
Illinois Center for Transportation, ICT-08-052, equation 22
Asphalt Overlay Thickness & RAP
SN effective = a₁c₁(D HMA − D mill) + a₂c₂D base + a₃c₃D subbase.
D overlay = max(0, SN future − SN effective) / a overlay.
Binder savings from site stock = min(RAP recovered, RAP needed) × RAP binder fraction × available fraction.
The effective coefficients are entered intact coefficients multiplied by field condition factors. Aggregate support is retained during the HMA-only mill cut. The recovered and replacement compacted material densities are entered separately. The binder mass balance credits the amount of available binder in the on-site RAP used in the new mix.
FHWA NHI-05-037, layer coefficients for rehabilitation