Worked example · Energy
77 kWh EV at a 150 kW DC Station, 10–80%
Estimate a 10–80% DC session with 105 kW average connector power after taper and 94% efficiency.
Setup
Results
Runs in your browserSetup
- Distance per year
- 12000 mi
- EV battery energy use
- 28 kWh/100 mi
- Electricity price
- 0.16 $/kWh
- Gasoline price
- 3.6 $/US gal
- Gas vehicle economy
- 28 mpg US
- Hybrid vehicle economy
- 48 mpg US
- Usable battery capacity
- 77 kWh
- Starting charge
- 10 %
- Target charge
- 80 %
- AC wall-to-pack efficiency
- 90 %
- Level 1 current at 120 V
- 12 A
- Level 2 line voltage
- 240 V
- Level 2 charging current
- 40 A
- Vehicle AC input limit
- 10.9 kW
- DC session-average power
- 105 kW
- DC connector-to-pack efficiency
- 94 %
- Annual EV energy cost
- $597.33
- 3,733 kWh from wall
- Annual gas energy cost
- $1,542.86
- Hybrid $900
- Five-year EV savings vs gas
- $4,727.62
- Vs hybrid $1,513.33
- Level 2 recharge time
- 6.24 h
- 53.9 kWh into battery
| Vehicle | Per year | Per 100 mi | Annual energy |
|---|---|---|---|
| EV | $597.33 | $4.98 | 3,733 kWh |
| Gas | $1,542.86 | $12.86 | 429 US gal |
| Hybrid | $900 | $7.5 | 250 US gal |
| Type | Input power | Metered energy | Time |
|---|---|---|---|
| Level 1 | 1.44 kW | 59.89 kWh | 41.59 h |
| Level 2 | 9.6 kW | 59.89 kWh | 6.24 h |
| DC fast | 105 kW | 57.34 kWh | 0.55 h |
This compares energy only and assumes the entered wall-to-pack efficiency and local rates. Tariffs, temperature, usable capacity and charge taper affect real costs and times. Enter equipment current available to the vehicle and use the vehicle’s charging specifications.
Spec sheet
Worked math for the starting setup
Calculate the energy window
77 × 0.70 = 53.9 kWh into the battery. Divide by 0.94 to get 57.34 kWh from the connector.
Use the session average
57.34 ÷ 105 = 0.546 hours, or about 33 minutes.
The 150 kW station label is its possible output. A measured average should reflect the specific vehicle, temperature and state-of-charge window.
Common questions
Should I type 150 kW or 105 kW for this 77 kWh charging window?
Use the measured or estimated 105 kW session average. The 150 kW nameplate only sets an upper bound under suitable conditions.
Why can a 10–80% charge be longer than the battery kWh divided by rated DC power?
Connector losses and changes in power during the session raise the time. The average can be lower than peak station power.