Worked example · Energy

Model Y 75 kWh, 10–80% Charge at 48 A

Estimate a 10–80% Level 2 charge on a 75 kWh Model Y example and compare annual electricity with gas and hybrid costs.

Setup

Driving and energy prices (USD)
mi
kWh/100 mi
$/kWh
$/US gal
mpg US
mpg US
Battery and charging equipment
kWh
%
%
%
A
V
A
kW
kW
Include charging taper within the chosen SOC window.
%
View results

Results

Runs in your browser
Annual EV energy cost
$597.33
3,733 kWh from wall
Annual gas energy cost
$1,542.86
Hybrid $900
Five-year EV savings vs gas
$4,727.62
Vs hybrid $1,513.33
Level 2 recharge time
5.07 h
52.5 kWh into battery
Annual electricity and fuel cost
Annual energy cost for EV, gas and hybridBars compare total electricity or gasoline costs at the same annual distance. Values are in US dollars. ENERGY COST PER YEAREV$597Gas$1,543Hybrid$900
Energy cost comparison
VehiclePer yearPer 100 miAnnual energy
EV$597.33$4.983,733 kWh
Gas$1,542.86$12.86429 US gal
Hybrid$900$7.5250 US gal
Recharge window
TypeInput powerMetered energyTime
Level 11.44 kW58.33 kWh40.51 h
Level 211.5 kW58.33 kWh5.07 h
DC fast110 kW55.26 kWh0.5 h

Spec sheet

Worked math for the starting setup

  1. Find the needed energy

    75 × (0.80 − 0.10) = 52.5 kWh into the battery. At 90% efficiency the wall supplies 58.33 kWh.

  2. Check the effective power

    240 × 48 ÷ 1,000 = 11.52 kW. Use the entered 11.5 kW vehicle limit for 58.33 ÷ 11.5 ≈ 5.07 hours.

At 12,000 miles per year the example compares the same miles using 28 kWh/100 mi, 28 mpg and 48 mpg. Use the usable battery capacity and AC limit for your specific trim and equipment.

See formulas and assumptions for ev vs gas costs & charging

Common questions

How long is 10% to 80% on a 75 kWh Model Y example at 48 A?

About 5.07 hours at 240 V with an 11.5 kW onboard limit and 90% wall-to-pack efficiency.

Why does this 75 kWh charge draw more than 52.5 kWh from the wall?

52.5 kWh arrives at the pack. The example includes AC charging losses, putting electricity billed at about 58.33 kWh.