Methods and assumptions

The calculations combine first-principles geometry and mass balances with documented empirical correlations. The settings on each tool expose the quantities and assumptions you can substitute.

Unit and mass conventions

US TPH means short tons per hour. SI t/h means metric tonnes per hour. A short ton is 2,000 pounds, or exactly 0.90718474 metric tonnes. GPM uses the US liquid gallon. HP is mechanical horsepower, approximately 0.7457 kW. Slopes stored as rise/run are displayed in inches per foot in US and degrees in SI.

Inputs are stored in one canonical basis. Switching units only changes their display. Bond work index and specific energy convert with the mass basis, so calculated power is the same. Conveyor belt widths in inches and nominal millimetre sizes are approximate trade equivalents.

Models by calculator

Stockpile

R and r are base and top radii. The cone has r = 0. The input repose angle is measured up from horizontal. Measure its actual slope where the pile profile or material varies.

Vibrating Screen

The default C₀ is 2.2 × aperture(in)^0.55 short tons/h/ft². Reference conditions are 25% oversize, 40% half-size, 100 lb/ft³, top deck, dry screening and 90% recovery. Fo = 1 + 0.5(oversize fraction − 0.25), Fh = 1 + (half-size fraction − 0.40), and Fd = 1/0.9/0.8 by deck position (top/second/third respectively). Wet spray uses Fw = 1 + 0.3/(1 + aperture(in)²). Fρ scales with bulk density. The curve and corrections are illustrative VSMA-style estimates. Use an OEM rating and validate motion, media open area, bed depth and blinding before selection.