Zone B offset = 0.008025 − (0.0066) = 0.001425 m³/s.
Starting result snapshot
A–B step
+0.0602195 in.wg
B–C step
+0.0602195 in.wg
Zone A offset
+13.9846 CFM
Zone C offset
-17.004 CFM
Equations and assumptions
Door-crack and other paths
A = perimeter × gap + A_other
Include only the portion of perimeter with a leak path. Enter wall, pass-through and fitting leakage as equivalent area at the same discharge coefficient.
Use Pa, m² and kg/m³ for Q in m³/s. All three pressures share the same reference. The differential across each closed barrier determines both rate and direction.
Supply minus exhaust
A: Q_AB · B: Q_BC − Q_AB · C: −Q_BC
These are the room offsets attributable to the two modeled door links. Add other envelope paths and use a balanced airflow network for the full system. Open doors, transients and alarm tolerances require testing.
Ladder check
Minimum aligned step = min(s × ΔP_AB, s × ΔP_BC)
The sign s is +1 for an A-to-C cascade and −1 for containment toward A. The FDA closed-door aseptic guidance gives 10–15 Pa as a typical example between different clean classifications. Use the project pressure specification.
CleanroomVentLab · Calculation sheet · US customary
Tight interlocked doors
Inputs
Intended direction
Positive · A → B → C
Zone A pressure
0.120439 in.wg
Zone B pressure
0.0602195 in.wg
Zone C pressure
0 in.wg
Minimum step
0.0602195 in.wg
Leaking perimeter
19.685 ft
Mean crack width
0.0137795 in
Other leakage area
0.155 in²
Leaking perimeter
18.0446 ft
Mean crack width
0.0177165 in
Other leakage area
0.310001 in²
Discharge coefficient
0.6
Air density
0.0749136 lb/ft³
Results
A–B step
+0.0602195 in.wg
B–C step
+0.0602195 in.wg
Zone A offset
+13.9846 CFM
Zone C offset
-17.004 CFM
A → B transfer
+13.9846 CFM
B → C transfer
+17.004 CFM
A–B equivalent leakage
3.41001 in²
B–C equivalent leakage
4.14626 in²
Zone A supply minus exhaust
+13.9846 CFM
Zone B supply minus exhaust
+3.0194 CFM
Zone C supply minus exhaust
-17.004 CFM
Weakest aligned step
+0.0602195 in.wg
Required step
0.0602195 in.wg
Both pressure steps meet the entered magnitude and direction.
For preliminary engineering and EHS / Industrial Hygiene review. Design calculations do not replace review by a licensed professional engineer (PE) and a certified industrial hygienist (CIH), commissioning tests, ISO 14644 classification or certification, or assessment against the applicable NFPA 86 edition.