Worked example · Warehouse planning

Dairy chill warehouse

A chilled dairy facility has a high daytime duty and a lower overnight compressor load.

Rack positions
1,755
Annual energy
401,294kWh/yr
Annual cost
49,359USD/yr
Peak draw
72.4kW
Edit inputs

Inputs

Edit any value to recalculate.

Storage footprint

Use one storage position footprint including the assigned rack clearance around the pallet.

m
m
m
m
m
%
m
m
Refrigeration load profile
kW
kW/TR
h/day
%
%
kW
days
Electric defrost & tariff

The currency changes the billing label. Enter the local rate per kWh in that currency.

kW
cycles/day
min
%
USD/kWh

Available clear height limits the rack levels below the entered target.

Annual refrigeration electricity

Annual refrigeration electricityElectric heaters and the compressor work required to remove retained defrost heat appear as two separate energy uses.Energy use / kWh per operating yearBase compressor344,337Defrost heaters3,504Defrost recovery893Auxiliaries52,560Annual total401,294 kWh

Electric heaters and the compressor work required to remove retained defrost heat appear as two separate energy uses.

Calculation breakdown

Energy cost per position per month
2.34USD/position/mo
Usable rack levels
3
Positions per rack level
585
Net rack floor area
826.8m²
Equivalent full-load hours per day
14.4h/day
Base compressor electricity
344,337kWh/yr
Defrost heater electricity
3,504kWh/yr
Defrost heat returned to room
2,453kWhₜₕ/yr
Defrost recovery electricity
893kWh/yr
Auxiliary electricity
52,560kWh/yr
Defrost heater on-time
0.8h/day

Work through this case

  1. Usable rack levels 3
  2. Base compressor electricity 344,337kWh/yr
  3. Annual cost 49,359USD/yr

Adjust peak and off-peak fractions from metered or modeled load. The clear-height check can reduce the planned rack count.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Rack positions

positions = floor(net area / pitch footprint) × min(planned, height-limited levels)

The area factor covers circulation and unavailable floor area. The clear height check uses the overhead clearance and rack level pitch. Verify rows, egress, fire protection, and structure separately.

Energy and defrost

kWh = base compressor + heater + defrost recovery + auxiliaries

Apply peak and off-peak load percentages over their daily hours. Heater kWh is power × cycles × cycle hours × days. Convert retained room heat into compressor recovery electricity at the entered kW/TR.

Peak and cost

annual cost = annual kWh × tariff • position cost = annual cost / (positions × 12)

Peak adds the compressor, active heater, and auxiliaries if they run together. With staging, the compressor draw must cover its daily energy and defrost recovery during the heater-off hours. If that requires more than rated draw, the staged peak is unavailable. The tariff estimate covers energy charges.

References

Questions and answers

What should I check in the dairy chill warehouse example?

Adjust peak and off-peak fractions from metered or modeled load. The clear-height check can reduce the planned rack count.