Concrete Slab, Footing, Wall, Column & Bags Calculator
Find concrete volume in cubic yards and cubic meters. Estimate 40, 60 and 80 lb bags, wet weight and 10-yard ready-mix loads.
Estimate
- Confirm packaged yield, truck capacity and minimum order with your supplier.
- Order volume · equivalent
- 2.447 m³
- Net volume
- 2.963 yd³
- Estimated wet weight
- 6.26 short ton
- Wet weight · equivalent
- 5.68 t
- 40 lb bags
- 288
- 60 lb bags
- 192
- 80 lb bags
- 144
- Ready-mix loads
- 1
- Volume in last truck
- 3.2 yd³
Download
How the estimate works
Measure the net pour
For a rectangular pour, multiply its three dimensions in consistent units. For a round column, multiply π by radius squared and height. Multiply by the number of identical forms.
Add ordering allowance
Multiply the net volume by 1 + waste ÷ 100. Divide cubic feet by 27 for cubic yards. The weight estimate uses the entered wet concrete density.
Compare bags and trucks
Divide order volume by the product’s yield and round up. The bag estimates use 0.30, 0.45 and 0.60 ft³ per 40, 60 and 80 lb bag. Ready-mix loads round up using a nominal 10 yd³ truck.
References
Questions & answers
How do I calculate cubic yards for a concrete slab?
Convert the thickness to feet, multiply length × width × thickness, then divide by 27. Apply your order allowance to that volume.
How many 80 lb bags make one cubic yard of concrete?
At 0.60 ft³ per bag, 27 ÷ 0.60 gives 45 bags before waste. Use the yield printed on your own mix.
How do I measure thickened slab edges without counting concrete twice?
Calculate the full slab at its regular thickness first. Add only the depth below that slab over the thickened footprint.