Basement stair takeoff for a 108 in rise

A straight basement flight rises 108 in to an existing landing. It uses a 7 in perpendicular waist and a 42 in clear planning width.

Inputs

Measurement system
in
in
For a typical residential stair, start around 7 to 7¾ in.
in
ft
ft
in
Measure perpendicular to the slope.
%
STAIR ELEVATIONStraight stair flight, waist and optional top landing. STAIR ELEVATION Rise 108 inRun 11.38 ft14 risers · 13 treadsWaist 7 in · 36.3° pitch

Estimate

Concrete to order
1.665 yd³
  • Entered dimensions meet the basic straight residential stair screen. Verify adopted code, clear widths, headroom, nosings and landings.
Order volume · equivalent
1.273 m³
80 lb bags
75
Riser count
14
Treads before landing
13
Actual rise per step
7.714 in
Horizontal flight run
11.38 ft
Run including landing
11.38 ft
2R + T comfort check
25.93 in
Slope angle
36.3 °
Waist volume
1.067 yd³
Step wedge volume
0.474 yd³
Landing volume
0 yd³
Net concrete
1.541 yd³
Download

Working this example

Starting estimate 1.665 yd³Concrete to order

Measure headroom to the structure above the nosing line. The run calculation alone does not evaluate the opening.

See the calculator formulas and assumptions

Questions & answers

How many risers does the 108 in basement rise need?

108 ÷ 7.75 rounds up to 14 equal risers. Each riser is about 7.714 in.

Do I add concrete for an existing basement landing?

Leave the landing depth at zero when the landing already exists and the work covers the new flight.