Worked example
Stair and landing for a 49 in split-level rise
A seven-riser split-level flight reaches a 4 ft top landing. The worksheet breaks out landing, step wedges and the structural waist.
Estimate
Concrete to order
- Entered dimensions meet the basic straight residential stair screen. Verify adopted code, clear widths, headroom, nosings and landings.
- Order volume · equivalent
- 0.82 m³
- 80 lb bags
- 49
- Riser count
- 7
- Treads before landing
- 6
- Actual rise per step
- 7 in
- Horizontal flight run
- 5.5 ft
- Run including landing
- 9.5 ft
- 2R + T comfort check
- 25 in
- Slope angle
- 32.47 °
- Waist volume
- 0.458 yd³
- Step wedge volume
- 0.208 yd³
- Landing volume
- 0.346 yd³
- Net concrete
- 1.011 yd³
Download
Working this example
Starting estimate 1.072 yd³Concrete to order
Use one calculation per flight if a second flight turns at the landing. Assign the common landing to one pour quantity.
Questions & answers
How much of this split-level stair takeoff is landing concrete?
The landing is 4 × 3.5 × (8 ÷ 12) ft, or about 9.33 ft³ before waste.
Can I estimate two flights meeting at this split-level landing in one run?
Calculate the two straight flights separately. Include the shared landing once.