Uphill steady pull
Fsteady = W(sin α + μ cos α)
A percent grade converts by α = atan(grade/100). Friction applies to the ramp-normal load.
Static ramp and haul-line forces
A 65,000 lb casting moves along greased steel rails on nominally level ground with a single-part haul line.
Schematic geometry. Margin bars mark 100% of the entered limit.
At zero angle the static gravity component is zero. Friction and breakaway still create line pull.
Ramp pull to start movement 12,187.5 lbf · Ramp pull during steady travel 9,750 lbf
Fsteady = W(sin α + μ cos α)
A percent grade converts by α = atan(grade/100). Friction applies to the ramp-normal load.
Fstart = W(sin α + μstart cos α)
μstart is steady μ × breakaway multiplier. Apply the entered reserve, then divide by purchase parts × aggregate efficiency.
H = reserve × W sin α
The independent inline downhill restraint receives no friction credit. An anchor at a redirect sheave carries the vector sum of rope tensions.
Use measured or reviewed friction values. Confirm the working-layer winch rating, anchor load path, braking, surface integrity and route geometry with a qualified team. Snagging, side pulls and transient forces can govern.
CraneRiggingLab · Lift screening worksheet
Static ramp and haul-line forces · US · lb
Screening estimates only. Have a qualified rigger and a professional engineer (PE), where required, review the lift plan. Use the OEM chart for the actual configuration.
Use measured or reviewed friction values. Confirm the working-layer winch rating, anchor load path, braking, surface integrity and route geometry with a qualified team. Snagging, side pulls and transient forces can govern.