ASME B30.5 · OSHA 1926.1402

Square timber mat with estimated corner load

A 95,000 lb crane picks a 31,000 lb load with 3,000 lb of hook and rigging equipment. The modeled peak corner share is 55%.

Inputs

Peak reaction
lb
lb
lb
%
Pad and ground
ft
in
in
psf
Use the verified allowable for this crane set-up.
Back to results ↑

Results

Static screeningEdit inputs ↓
Outrigger and mat sectionPEAK REACTION70,950lbfGROUND PRESS2,657.86psfBEARING AREA26.69ft²SOIL USE84.84%JACK REACTION45° spreadMatSoilEffective contactSoil bearing limit84.84%Applied reactionMat load spreadGround contactLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results
  • Estimated corner share selected. Use the peak OEM reaction for the complete lift path.
  • The 45° spread reaches only part of the pad footprint in this model.
Peak reaction at one pad
70,950 lbf
Effective ground pressure
2,657.86 psf
Effective bearing area
26.69 ft²
Allowable pressure used
84.84 %
Effective pressure in psi
18.46 psi
Full-footprint pressure
1,447.96 psf
Effective width or diameter
5.17 ft
Area needed at entered limit
22.65 ft²
Entered allowable pressure
3,132.82 psf

Trace the reaction through both sides of the mat at 45°. Compare the effective and full-pad pressures.

Peak reaction at one pad 70,950 lbf · Effective ground pressure 2,657.86 psf

Peak corner reaction

R = (Wcrane + Wload + Wrigging) × f

Enter the highest OEM reaction over the full lift path when available. The corner-share option is a provisional estimate.

Effective contact

Dₑ = min(Dpad, Dfoot + 2t)

Assume centered load and a 45° spread through the mat thickness t. Apply the limit on each rectangular axis. For round pads use πDₑ²/4.

Bearing pressure

p = R / Aₑ

Compare with the site-specific allowable pressure. Full-pad pressure is a reference and assumes complete load distribution.

Use a verified geotechnical bearing value and OEM outrigger reactions. Have pad or mat strength, effective bearing, settlement, slope, underground services and voids checked separately.