Inventory · Worked example
EOQ and safety stock for bicycle repair parts
Calculate reorder point and cash buffer in Canadian dollars for imported bicycle repair kits with a long, variable replenishment lead time.
Scenario note. Rerun the forecast with a faster domestic supplier. Its higher unit cost may change holding expense while shorter lead times reduce the reorder buffer.
How this estimate works
Assume daily demand is independent across days and independent of supplier lead time. Allow for both sources of variation and use a normal approximation to size the stock buffer. Round safety stock and the reorder point up to whole units.
Use inventory position to trigger the reorder: units on hand plus units on order, less backorders. The chart shows on-hand units under steady consumption and instant receipt. Several purchase orders can be open at once.
EOQ balances order setup and holding costs over 365 days. The result compares the whole quantities around the continuous optimum. Review carton multiples, supplier minimums, capacity, and seasonality separately.
Frequently asked questions
What portion of the repair kit buffer comes from lead time?
Set lead-time variation to zero while keeping demand variation unchanged. Compare that buffer with the original calculation to see the combined effect.
Will the bicycle kit buffer account for multi-item shortages?
Treat this as a single stock-keeping unit. Plan unavailable components and any substitution rules separately.