Inventory · Worked example

Reorder buffer for electronics supplier delays

Model cable assemblies with moderate sales variability and large lead-time swings. Check how the service level affects the working capital buffer.

Scenario note. Use received order history for lead time from purchase order to available stock. Inspection or quarantine can extend the usable lead time.

Edit this example

Results ↓
USD $

Inputs

Demand and lead time
54
12
28
11
98% · Z 2.054
Purchasing and carrying cost
$ $110
$ $5.9
% 21%

Estimate

Reorder point (units)
2,739
Safety stock (units)
1,227
Economic order quantity
1,871
Stock on hand through the order cycle
Stock on hand through the order cycleOn-hand inventory falls from 3.1k units to safety stock of 1.2k units. The reorder point uses inventory position and is 2.7k units.Units on handROP uses inventory position01.8k3.7kROP 2.7kSafety stock 1.2k034.6569.3Time since first receipt · days
Service level Z-score
2.05
Annual demand
19,710
Expected lead-time demand
1,512
Lead-time demand standard deviation
597.38
Annual holding cost per unit
$1.24
Optimal orders per year
10.53
Average units on hand
2,162.5
Average days on hand
40.05 days
Days between orders
34.65 days
Cash in safety stock
$7,239.30

How this estimate works

Assume daily demand is independent across days and independent of supplier lead time. Allow for both sources of variation and use a normal approximation to size the stock buffer. Round safety stock and the reorder point up to whole units.

Use inventory position to trigger the reorder: units on hand plus units on order, less backorders. The chart shows on-hand units under steady consumption and instant receipt. Several purchase orders can be open at once.

EOQ balances order setup and holding costs over 365 days. The result compares the whole quantities around the continuous optimum. Review carton multiples, supplier minimums, capacity, and seasonality separately.

View the full methodology

Frequently asked questions

Can repeated supplier shutdowns break the lead-time assumption?

Yes. Planned closures and long tail delays are worth separate scenarios. The model uses a normal approximation based on the mean and variation you enter.

Why could the cable reorder point be above the cycle’s on-hand peak?

Reordering uses inventory position, which adds open orders. Lead time can span multiple cycles on the on-hand chart.