Inventory · Worked example
Reorder buffer for electronics supplier delays
Model cable assemblies with moderate sales variability and large lead-time swings. Check how the service level affects the working capital buffer.
Scenario note. Use received order history for lead time from purchase order to available stock. Inspection or quarantine can extend the usable lead time.
How this estimate works
Assume daily demand is independent across days and independent of supplier lead time. Allow for both sources of variation and use a normal approximation to size the stock buffer. Round safety stock and the reorder point up to whole units.
Use inventory position to trigger the reorder: units on hand plus units on order, less backorders. The chart shows on-hand units under steady consumption and instant receipt. Several purchase orders can be open at once.
EOQ balances order setup and holding costs over 365 days. The result compares the whole quantities around the continuous optimum. Review carton multiples, supplier minimums, capacity, and seasonality separately.
Frequently asked questions
Can repeated supplier shutdowns break the lead-time assumption?
Yes. Planned closures and long tail delays are worth separate scenarios. The model uses a normal approximation based on the mean and variation you enter.
Why could the cable reorder point be above the cycle’s on-hand peak?
Reordering uses inventory position, which adds open orders. Lead time can span multiple cycles on the on-hand chart.