Track actual first-pass unit yield and opportunity defects in a 2,000-gauge calibration run.

DPMO = Defects ÷ Opportunities × 1,000,000

Baseline reading

Twenty gauges failed at least one check even though 24 checks failed. That gives 99% first-pass unit yield and 4,000 DPMO across the three checks.

What to test

Record which calibration points fail together. Shared drift across checks can change the relationship between opportunity performance and failed-gauge counts.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Inspection tally

Enter the actual failed-unit count for measured FPY.

Step first-pass yields
%
%
%
%
%
%

Results

Defects per million opportunities
4,000
Normal-equivalent sigma level
4.15207σ
Defects per unit
0.012
Defect rate and sigma benchmark
Defect rate and sigma benchmark Observed defects per million opportunities on a logarithmic scale, with the equivalent sigma at the reference marks. DPMO / LOG SCALE+1.5σ convention0.00017.9σ0.017.1σ16.3σ1005.2σ10K3.8σ1M—4K DPMO
Opportunity yield
99.6%
First-pass unit yield
99%
Rolled throughput yield
98.705%
Total defect opportunities
6,000

Model notes

Measure first-pass unit yield with the number of units that failed at least once. If that tally is blank, the worksheet estimates unit yield as exp(−DPU) under a Poisson model.

The 1.5σ option adds a reporting convention to a one-sided normal equivalent. Use consistent opportunity definitions when comparing processes.

View the equations

Frequently asked questions

What counts as a gauge calibration opportunity here?

Define one independent scoring position per check in the agreed calibration plan. Keep the listed checks consistent across the 2,000 gauges.

Does a gauge pass after adjustment erase its first-pass failure?

Keep the initial failure in the first-pass tally. Track the adjusted gauge’s final disposition separately.