Worked example · Pull replenishment

Paint-line hanger pull loop

Plan a loop of reusable hangers for a paint station with a three-quarter-day return and 30-hanger racks.

Cards = ceil(Demand × Lead time × (1 + Buffer) ÷ Bin qty)

Baseline reading

Two racks hold 60 hangers. Lead demand is 54, leaving a modeled reserve of six after rounding.

What to test

Time stripping and housekeeping tasks in the return loop. If racks sit in maintenance, treat that delay as replenishment lead time.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Replenishment loop
units/day
day
%

A 10–30% planning range is common. Check variability and upstream service.

Inventory economics
$

Results

Kanban cards or containers
2
Maximum loop units
60
Modeled average WIP
33 units

Two containers cover the entered demand, lead time, and reserve.

Kanban loop and reserve
Kanban loop and reserve Stock draws down from full containers to the safety and rounding reserve before replenishment. The bottom row represents the card loop. LEAD-TIME DRAWDOWN2 BINSFull stockReplenish612Card loop
Lead-time demand
54 units
Requested safety stock
5.4 units
Reserve after container rounding
6 units
Annual inventory turns
567.27×
Average capital in loop
$462.00
Maximum capital in loop
$840.00

Model notes

Lead time starts when consumption sends the signal and ends when replenished stock can be used. Keep demand days and lead-time days on the same operating calendar.

The average models a straight drawdown from full inventory to the remaining reserve during a lead-time cycle. Use actual stock history to check inventory turns.

View the equations

Frequently asked questions

How should damaged hangers be represented in the paint loop?

Exclude unusable hangers from active stock and track replacements as a separate loss. Use only verified usable rack capacity as the bin quantity.

Can hanger demand be measured in painted parts instead of hangers?

Convert to hangers consumed per day using the rack loading pattern, or define both demand and container quantity in a consistently equivalent unit.