Tractor Implement Field Capacity (Acres/Hr), Pass Time & Diesel Fuel Calculator
Budget the time and fuel for one pass using actual work width and ground speed. Account for headlands and delays with a field efficiency you can defend.
Planning estimate
- Effective field capacity
- 17.45 ac/h
- Theoretical field capacity
- 21.82 ac/h
- Total time in field
- 9.17 h
- Ideal pass time at full utilization
- 7.33 h
- Time allowed for field losses
- 1.83 h
- Estimated fuel burn per hour
- 7.9 gal/h
- Estimated fuel burn per area
- 0.453 gal/ac
- Estimated diesel for this pass
- 72.42 US gal
- Estimated fuel cost per area
- $1.65 per ac
- Estimated total fuel cost
- $264.35
Questions from the field
Which implement width should I use?
Enter effective working width during a productive pass. If you already subtract overlap from width, avoid charging that same overlap a second time in field efficiency.
Does field time include trips between fields?
The entered efficiency accounts for losses within the field. Add road travel, major repairs and weather delays separately when scheduling.
How is tractor fuel estimated?
Hourly diesel use is estimated with a full-throttle model based on rated PTO power and equivalent load. Tractor, throttle setting and operating conditions affect measured burn.