NEC Chapter 9 Table 1 uses 53% for one cable, 31% for two and 40% for three or more when that table applies. The diagram shows equivalent area. Installation clearances and jamming depend on the actual cable geometry.
Static and loaded bends
Rstatic = 10 × OD; Rloaded = 20 × OD
These are editable planning multipliers. Compare the planned bend with the cable manufacturer’s loaded minimum and use the actual measured bore for fill.
Capstan pull model
Tout = Tin × e^(μθ) + μ × W × L
Enter the bend angle in degrees. The model uses radians, total bundle weight per length W, and a horizontal straight section after the bend. Sidewall loading at the bend exit is a simple tension/radius estimate.
EMT uses nominal planning bores. The Schedule 40 PVC presets use minimum electrical-conduit bores from the linked CANTEX drawing. HDPE uses IPS SDR 13.5 geometry before wall tolerances. Enter the actual product bore and verify the locally adopted code. The initial 600 lbf threshold is about 2,669 N. Some cable sheets specify 2,700 N separately. Enter the actual cable or pulling assembly rating and plan complex or inclined pulls section by section.
Large capstan amplification on an S-bend equivalent
Installation limit exceeded. Check the following limits again: pull tension.
Inputs
Conduit type
PVC Schedule 40
Nominal trade size
2 in.
Measured conduit ID
51.3334 mm
Cable outside diameter
10 mm
Identical cables
4
Actual bend radius
400 mm
Bend angle
270 °
Straight length after bend
180 m
Weight per cable length
1.2 N/m
Friction coefficient
0.45 μ
Tension entering bend
420 N
Rated pull tension
2,700 N
Static radius / cable OD
10 ×
Loaded radius / cable OD
20 ×
Results
Internal conduit area
2,069.617 mm²
Total cable area
314.159 mm²
Calculated fill
15.18 %
NEC fill limit
40 %
Minimum static bend radius
100 mm
Minimum loaded bend radius
200 mm
Tension exiting bend
3,501.09 N
Straight-run contribution
388.8 N
Total pull tension
3,889.89 N
Rated tension remaining
-1,189.89 N
Estimated sidewall load
8,752.726 N/m
Follow IEC 60825-2 and ANSI Z136.2 procedures. Never inspect an energized fiber or connector with your eye or an optical magnifier. Verify the installed link with a calibrated power meter and field OTDR at the relevant wavelengths, using appropriate launch and receive fibers and a safe test setup.
Correct the inputs to print an engineering report.