NFPA 13 · Worked example

Small dwelling dry-pipe system

A compact dwelling dry system has one short main and a low supervisory pressure. The compressor is sized from an empty-to-pressure estimate.

Inputs

System arrangement
Pipe inventory
ft
ft
ft
ft
gal

Include riser trim or vessels. Use zero length for unused pipe rows.

Air supply
psi
SCFM
SCFM

Supervisory pressure fill curve

Worksheet units
Edit inputs
Supervisory pressure fill curve · Input-linked engineering diagramSYSTEM VOLUME51.43galREQUIRED AIR0.68SCFMFILL TIME3.51minAIR RESERVE2.12SCFMAir · psiFill curve30-min limit0102003040Elapsed time · minCompressor vs. required air+2.12 SCFM0 SCFM0.68 SCFM target1.36 SCFM
Check timed water delivery

Dwelling dry pipe. Use the applicable timed delivery requirement.

How to read this example

The air fill may clear 30 minutes while the dwelling water-delivery provision still applies. The volume-based shortcut is disabled.

Open the base calculator

Calculated values

Total system volume
51.43 gal
Pipe volume subtotal
47.43 gal
Free air added from 0 psig
8.42 ft³
Required free-air delivery
0.68 SCFM
Modeled fill time
3.51 min
Compressor delivery reserve
2.12 SCFM
Selected dry-pipe volume allowance
Timed delivery applies
Dry-pipe volume reserve
See delivery criteria
Pipe volume by run 4 rows
Pipe volume by run
RunInternal boreinLengthftVolumegal
12.15718034.2
21.09727013.3
31.44200
41.09700

Equations and assumptions

  • V_pipe = Σ π d² L / 4
  • V_free = V_system × P_gauge / P_atm
  • FAD_30 = V_free / 30 + leakage

The non-dwelling dry-pipe volume screening paths are 500 gal without a quick-opening device or 750 gal with one. Larger volumes can use applicable timed delivery or listed calculation paths. Dwelling dry pipe and preaction require their own delivery criteria.

The isothermal fill starts at 0 psig with free air referenced to 14.696 psia. Use delivered compressor airflow at the target pressure and the valve manufacturer’s supervisory setpoint.

The 30-minute curve describes air restoration. Water delivery after sprinkler operation is evaluated separately.

Source references

Related examples