NFPA 13 · Worked example

Large warehouse dry system with a slow fill

A warehouse dry riser serves three long pipe sizes. Its 9 SCFM compressor restores air against a 0.6 SCFM leakage allowance.

Inputs

System arrangement
Pipe inventory
ft
ft
ft
ft
gal

Include riser trim or vessels. Use zero length for unused pipe rows.

Air supply
psi
SCFM
SCFM

Supervisory pressure fill curve

Worksheet units
Edit inputs
Supervisory pressure fill curve · Input-linked engineering diagramSYSTEM VOLUME1,201.13galREQUIRED AIR15.53SCFMFILL TIME53.33minAIR RESERVE-6.53SCFMAir · psiFill curve30-min limit0255003070Elapsed time · minCompressor vs. required air-6.53 SCFM0 SCFM15.53 SCFM target31.06 SCFM
30-minute fill target missed

The selected compressor cannot restore the entered supervisory pressure in 30 minutes.

How to read this example

The plot shows where the fill pressure stands at 30 minutes. The larger pipe inventory separately calls for a water-delivery evaluation.

Open the base calculator

Calculated values

Total system volume
1,201.13 gal
Pipe volume subtotal
1,189.13 gal
Free air added from 0 psig
447.96 ft³
Required free-air delivery
15.53 SCFM
Modeled fill time
53.33 min
Compressor delivery reserve
-6.53 SCFM
Selected dry-pipe volume allowance
750 gal
Dry-pipe volume reserve
-451.13 gal
Pipe volume by run 4 rows
Pipe volume by run
RunInternal boreinLengthftVolumegal
16.357460758.4
23.26690299.2
31.4421,550131.5
41.09700

Equations and assumptions

  • V_pipe = Σ π d² L / 4
  • V_free = V_system × P_gauge / P_atm
  • FAD_30 = V_free / 30 + leakage

The non-dwelling dry-pipe volume screening paths are 500 gal without a quick-opening device or 750 gal with one. Larger volumes can use applicable timed delivery or listed calculation paths. Dwelling dry pipe and preaction require their own delivery criteria.

The isothermal fill starts at 0 psig with free air referenced to 14.696 psia. Use delivered compressor airflow at the target pressure and the valve manufacturer’s supervisory setpoint.

The 30-minute curve describes air restoration. Water delivery after sprinkler operation is evaluated separately.

Source references

Related examples