NFPA 13 · Worked example
Large warehouse dry system with a slow fill
A warehouse dry riser serves three long pipe sizes. Its 9 SCFM compressor restores air against a 0.6 SCFM leakage allowance.
Inputs
Supervisory pressure fill curve
Edit inputsThe selected compressor cannot restore the entered supervisory pressure in 30 minutes.
How to read this example
The plot shows where the fill pressure stands at 30 minutes. The larger pipe inventory separately calls for a water-delivery evaluation.
Open the base calculatorCalculated values
- Total system volume
- 1,201.13 gal
- Pipe volume subtotal
- 1,189.13 gal
- Free air added from 0 psig
- 447.96 ft³
- Required free-air delivery
- 15.53 SCFM
- Modeled fill time
- 53.33 min
- Compressor delivery reserve
- -6.53 SCFM
- Selected dry-pipe volume allowance
- 750 gal
- Dry-pipe volume reserve
- -451.13 gal
Pipe volume by run 4 rows
| Run | Internal borein | Lengthft | Volumegal |
|---|---|---|---|
| 1 | 6.357 | 460 | 758.4 |
| 2 | 3.26 | 690 | 299.2 |
| 3 | 1.442 | 1,550 | 131.5 |
| 4 | 1.097 | 0 | 0 |
Equations and assumptions
V_pipe = Σ π d² L / 4V_free = V_system × P_gauge / P_atmFAD_30 = V_free / 30 + leakage
The non-dwelling dry-pipe volume screening paths are 500 gal without a quick-opening device or 750 gal with one. Larger volumes can use applicable timed delivery or listed calculation paths. Dwelling dry pipe and preaction require their own delivery criteria.
The isothermal fill starts at 0 psig with free air referenced to 14.696 psia. Use delivered compressor airflow at the target pressure and the valve manufacturer’s supervisory setpoint.
The 30-minute curve describes air restoration. Water delivery after sprinkler operation is evaluated separately.