Clockwise legacy survey-foot parcel
Check a clockwise 43,560 ftUS² enclosure and volume conversion from survey-foot sections.
More examplesSurvey anatomy
Parcel & roadway cross sections
Computed results
Areas agree
Boundary geometry
- Shoelace area
- 4,046.87261m²
- Square feet
- 43,560.17424ft²
- Acres
- 1ac
- Hectares
- 0.40469ha
- Square survey feet
- 43,560ftUS²
- DMD area
- 43,560ftUS²
- Perimeter
- 836ftUS
- Point order
- Clockwise
Roadway volumes
- Average end area
- 6.88104m³
- Average end area
- 9.00005yd³
- Prismoidal volume
- 5.35192m³
- Prismoidal volume
- 7.00004yd³
- Correction Cₚ
- 1.52912m³
- Correction Cₚ
- 2.00001yd³
Boundary courses and DMD
| Leg | Start NftUS | Start EftUS | ΔNftUS | ΔEftUS | DMDftUS | DMD × ΔNftUS² |
|---|---|---|---|---|---|---|
| 1 | 0 | 0 | 198 | 0 | 0 | 0 |
| 2 | 198 | 0 | 0 | 220 | 220 | 0 |
| 3 | 198 | 220 | −198 | 0 | 440 | −87,120 |
| 4 | 0 | 220 | 0 | −220 | 220 | 0 |
Worked check
Clockwise order yields a negative signed area. The enclosed area uses its magnitude. The volumes start in cubic survey feet and are converted to International cubic yards or cubic meters.
- Signed area (ftUS²)
- −43,560
- DMD area (ftUS²)
- 43,560
- Prismoidal volume (ftUS³)
- 189
These checks describe the original example. Reset restores the original inputs.
Formulas and conventions
Compute plane-coordinate area
Signed double area = Σ(EᵢNᵢ₊₁ − Eᵢ₊₁Nᵢ)
Use three to eight distinct corners in perimeter order. The perimeter sums straight edges. The absolute half-sum is enclosed area. Positive signed area corresponds to counterclockwise order in a north-up plan.
Cross-check by DMD
DMD₁ = ΔE₁ · DMDᵢ = DMDᵢ₋₁ + ΔEᵢ₋₁ + ΔEᵢ · Area = |Σ(DMDᵢΔNᵢ)| ÷ 2
Both methods translate to a local origin before calculation. Acres use the International-foot definition; square U.S. survey feet are also reported when that working unit is selected.
Compare two roadway section volumes
AEA = L(A₁ + A₂) ÷ 2 · V = L(A₁ + 4Aₘ + A₂) ÷ 6 · Cₚ = AEA − V
Take Aₘ at the true midpoint. The prismoidal formula is exact for a prismoid and for a quadratic cross-section area profile. Compare like cut or fill areas. Positive Cₚ means average end area overstates the prismoidal volume.
More worked examples
Open a case to edit its inputs and compare the original checks.
- Rectangular parcel and constant section
Check a 60 by 40 m parcel and a constant-area roadway section.
- Triangular parcel and roadway wedge
Compute a right-triangle parcel and check a linearly changing end area.
- Concave woodlot and broad midsection
Subtract a triangular notch and check a negative prismoidal correction.
- Eight corners at large grid coordinates
Check a chamfered block without losing precision to large coordinate offsets.
- Positive prismoidal correction in a roadway reach
Compare unequal end areas with a midsection smaller than their average.
GeoSurveyLab · Field calculation
Clockwise legacy survey-foot parcel
Areas agree
Field inputs
- Working unit
- U.S. survey foot (ftUS)
- Number of corners
- 4
- Boundary coordinates 1
- 0 / 0
- Boundary coordinates 2
- 198 / 0
- Boundary coordinates 3
- 198 / 220
- Boundary coordinates 4
- 0 / 220
- Station separation
- 27 ftUS
- First section A₁
- 9 ftUS²
- Midsection Aₘ
- 6 ftUS²
- Last section A₂
- 9 ftUS²
Boundary geometry
- Shoelace area
- 4,046.8726m²
- Square feet
- 43,560.1742ft²
- Acres
- 1ac
- Hectares
- 0.4047ha
- Square survey feet
- 43,560ftUS²
- DMD area
- 43,560ftUS²
- Perimeter
- 836ftUS
- Point order
- Clockwise
Roadway volumes
- Average end area
- 6.881m³
- Average end area
- 9.0001yd³
- Prismoidal volume
- 5.3519m³
- Prismoidal volume
- 7yd³
- Correction Cₚ
- 1.5291m³
- Correction Cₚ
- 2yd³
Boundary courses and DMD
| Leg | Start NftUS | Start EftUS | ΔNftUS | ΔEftUS | DMDftUS | DMD × ΔNftUS² |
|---|---|---|---|---|---|---|
| 1 | 0 | 0 | 198 | 0 | 0 | 0 |
| 2 | 198 | 0 | 0 | 220 | 220 | 0 |
| 3 | 198 | 220 | −198 | 0 | 440 | −87,120 |
| 4 | 0 | 220 | 0 | −220 | 220 | 0 |
For planning, training, and independent checks. Have a locally licensed Professional Land Surveyor (PLS) verify legal boundaries and survey control. Have a licensed Professional Engineer (PE) verify engineering layout and design where required.