Vertical curve calculator
Plot equal- or unequal-tangent crest and sag curves, find the turning point, and screen stopping sight distance.
Worked examplesSurvey anatomy
Profile & sight-distance check
Computed results
Meets geometry
Tangent and curve controls
- PVC
- 22+40.000ft
- PVC elevation
- 611.48ft
- PVI
- 24+50.000ft
- PVI tangent elevation
- 618.2ft
- PVT
- 26+60.000ft
- PVT elevation
- 613.16ft
- Grade difference A
- −5.6%
- K rate
- 75ft/%
- High point station
- 24+80.000ft
- High point elevation
- 615.32ft
- Turning point grade
- 0%
Stopping sight distance check
- Required sight distance S
- 360ft
- Geometric minimum L
- 334.58919ft
- Geometric minimum K
- 59.74807ft/%
- Long-curve K at S
- 60.04724ft/%
- Sizing branch
- S > L
Profile elevations and grades
| Point | Stationft | Offset from PVCft | Elevationft | Grade% |
|---|---|---|---|---|
| PVC | 22+40.000 | 0 | 611.48 | 3.2 |
| Stake | 22+50.000 | 10 | 611.79333 | 3.06667 |
| Stake | 23+00.000 | 60 | 613.16 | 2.4 |
| Stake | 23+50.000 | 110 | 614.19333 | 1.73333 |
| Stake | 24+00.000 | 160 | 614.89333 | 1.06667 |
| Stake | 24+50.000 | 210 | 615.26 | 0.4 |
| High point | 24+80.000 | 240 | 615.32 | 0 |
| Stake | 25+00.000 | 260 | 615.29333 | −0.26667 |
| Stake | 25+50.000 | 310 | 614.99333 | −0.93333 |
| Stake | 26+00.000 | 360 | 614.36 | −1.6 |
| Stake | 26+50.000 | 410 | 613.39333 | −2.26667 |
| PVT | 26+60.000 | 420 | 613.16 | −2.4 |
Formulas and conventions
Build the symmetric profile
A = g₂ − g₁ · z(x) = zPVC + g₁x ÷ 100 + Ax² ÷ (200L)
PVC and PVT are L/2 either side of the tangent intersection PVI. Grades are entered in percent. When grades have opposite signs, x = −g₁L/A is the interior turning point and its slope is exactly zero.
Join unequal tangents
gⱼ = (L₁g₁ + L₂g₂) ÷ L · zⱼ = zPVI + A L₁ L₂ ÷ (200L)
L₁ is PVC to PVI and L₂ is PVI to PVT. Each parabola integrates a linear grade between the endpoint and common join grade. Find the zero grade on the piece where the signs change. The local K values are L₁/|gⱼ − g₁| and L₂/|g₂ − gⱼ|.
Calculate the curvature rate
K = L ÷ |A|
K is length per percentage point of grade change. Equal grades form a straight tangent and have no finite K. Station labels use 100-foot stations or kilometer plus meters, depending on the working unit.
Compare the SSD geometry
Lmin = |A| S² ÷ C when Lmin ≥ S · otherwise max(0, 2S − C ÷ |A|)
For a crest, C = 200(√h₁ + √h₂)², with eye height 3.5 ft and object height 2 ft. For a sag, C = 200(h + S tan 1°), with headlight height 2 ft. The two minimum-length branches apply to equal tangents. Unequal tangents use a sufficient screen: both local K values must meet S²/C. If either is tighter, check the complete sight line. Use the adopted agency criteria and drainage controls.
Worked examples
Open a case to edit its inputs and compare the original checks.
- Symmetric metric crest high point
Solve a symmetric 2% to −2% crest and check the high point at midcurve.
- Symmetric −3% to +3% sag
Find the low point and compare its curvature rate with a required sight distance.
- Rising crest without a high point inside
Distinguish a crest in grade change from a crest with an interior summit.
- Short-curve stopping sight distance
Apply the short-curve branch when the required sight distance exceeds the curve length.
- Equal grades give a straight tangent
Check elevation stationing when both grades are the same.
- Asymmetric sag in U.S. survey feet
Locate the low point of a −4% to +2% sag with unequal tangent lengths on an older alignment.
GeoSurveyLab · Field calculation
Vertical curve calculator
Meets geometry
Field inputs
- Working unit
- International foot (ft)
- Tangent lengths
- Equal tangent lengths
- Entering grade g₁
- 3.2 %
- Exiting grade g₂
- -2.4 %
- PVI station
- 24+50.000 ft
- PVI elevation
- 618.2 ft
- Curve length
- 420 ft
- Stake interval
- 50 ft
- Required sight distance
- 360 ft
Tangent and curve controls
- PVC
- 22+40.000ft
- PVC elevation
- 611.48ft
- PVI
- 24+50.000ft
- PVI tangent elevation
- 618.2ft
- PVT
- 26+60.000ft
- PVT elevation
- 613.16ft
- Grade difference A
- −5.6%
- K rate
- 75ft/%
- High point station
- 24+80.000ft
- High point elevation
- 615.32ft
- Turning point grade
- 0%
Stopping sight distance check
- Required sight distance S
- 360ft
- Geometric minimum L
- 334.5892ft
- Geometric minimum K
- 59.7481ft/%
- Long-curve K at S
- 60.0472ft/%
- Sizing branch
- S > L
Profile elevations and grades
| Point | Stationft | Offset from PVCft | Elevationft | Grade% |
|---|---|---|---|---|
| PVC | 22+40.000 | 0 | 611.48 | 3.2 |
| Stake | 22+50.000 | 10 | 611.7933 | 3.0667 |
| Stake | 23+00.000 | 60 | 613.16 | 2.4 |
| Stake | 23+50.000 | 110 | 614.1933 | 1.7333 |
| 4 rows omitted. Download CSV for the full table. | ||||
| Stake | 25+50.000 | 310 | 614.9933 | −0.9333 |
| Stake | 26+00.000 | 360 | 614.36 | −1.6 |
| Stake | 26+50.000 | 410 | 613.3933 | −2.2667 |
| PVT | 26+60.000 | 420 | 613.16 | −2.4 |