Worked example
Normally consolidated clay under fill
An embankment loads a normally consolidated clay layer bounded by permeable sand.
Results
Edit inputs ↓- Settlement
- 240.43 mm
- OCR
- 1
- Time to 50%
- 123 days
- Time to 90%
- 530.1 days
- Compression
- Time response
- Target
Normally consolidated clay follows the virgin compression slope.
Calculation details
| Stress path | NC |
|---|---|
| Final effective stress | 116 kPa |
| Final void ratio | 1.047 |
| Recompression settlement | 0 mm |
| Virgin compression settlement | 240.43 mm |
| Longest drainage path Hdr | 2.5 m |
| Target time factor Tv | 0.8481 |
| Time to target | 530.05 days |
| Settlement at target | 216.39 mm |
GeotechSoilLab · Screening sheet · Metric SI
Normally consolidated clay under fill
| Layer thickness H₀ | 5 m |
|---|---|
| Initial void ratio e₀ | 1.15 |
| Initial stress σ′₀ | 62 kPa |
| Preconsolidation σ′p | 62 kPa |
| Added stress Δσ′ | 54 kPa |
| Compression index Cc | 0.38 |
| Recompression Cr | 0.06 |
| Drainage faces | Double |
| Consolidation rate cv | 0.01 m²/day |
| Target consolidation U | 90 % |
| Settlement | 240.43 mm |
|---|---|
| OCR | 1 |
| Time to 50% | 123 days |
| Time to 90% | 530.1 days |
| Stress path | NC |
| Final effective stress | 116 kPa |
| Final void ratio | 1.047 |
| Recompression settlement | 0 mm |
| Virgin compression settlement | 240.43 mm |
| Longest drainage path Hdr | 2.5 m |
| Target time factor Tv | 0.8481 |
| Time to target | 530.05 days |
| Settlement at target | 216.39 mm |
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Worked result
The full stress increment follows the virgin compression slope. Double drainage shortens the time scale.
- Add 54 kPa to 62 kPa to get 116 kPa. The preconsolidation stress is 62 kPa.
- Add 0 mm of recompression and 240.431 mm of virgin compression to get 240.431 mm.
- Use Tv = 0.8481 and Hdr = 2.5 m in TvHdr²/cv. This gives 530.1 days to 90% consolidation.
Settlement240.43 mmOCR1Time to 50%123 daysTime to 90%530.1 days
Original case inputs
| Layer thickness H₀ | 5 m |
|---|---|
| Initial void ratio e₀ | 1.15 |
| Initial stress σ′₀ | 62 kPa |
| Preconsolidation σ′p | 62 kPa |
| Added stress Δσ′ | 54 kPa |
| Compression index Cc | 0.38 |
| Recompression Cr | 0.06 |
| Drainage faces | Double |
| Consolidation rate cv | 0.01 m²/day |
| Target consolidation U | 90 % |
Method & assumptions
- OCR = σ′p / σ′₀. Settlement is H₀/(1 + e₀) times the decrease in void ratio. Use Cr log₁₀(σ′/σ′₀) up to σ′p and Cc log₁₀(σ′/σ′p) beyond it.
- For normally consolidated clay, σ′p equals σ′₀ and the full stress increment follows Cc. Overconsolidated clay uses only Cr when final stress stays below or at σ′p.
- t = Tv Hdr² / cv. Hdr is H₀ for single drainage or H₀/2 for double drainage. Tv is found from Terzaghi’s average consolidation series and its short-time limit.
- Use a representative initial stress and added stress at the layer midpoint. The method assumes one homogeneous saturated layer, one-dimensional strain, sudden loading and constant cv. Compute separate layers when properties vary.
More worked examples
- Overconsolidated clay below yieldA modest foundation pressure increment leaves final stress below the soil’s prior maximum.
- Clay compressed past preconsolidationA heavy fill increment pushes an overconsolidated clay through its yield stress.
- Clay with single-sided drainageA clay layer is drained at its top and underlain by nearly impermeable material.
- Loading that reaches preconsolidation stressA staged load raises the effective stress exactly to the estimated preconsolidation stress.
- Time to 95% consolidationA staging study checks the estimated time to reach 95% primary consolidation for a thick layer.