Worked example

Clay compressed past preconsolidation

A heavy fill increment pushes an overconsolidated clay through its yield stress.

Settlement
10.95 in
OCR
1.45
Time to 50%
287.8 days
Time to 90%
1,240.6 days
Compression path & time response Schematic
Compression path & time response, schematic Void ratio vs. log σ′Degree vs. timeσ′p 2,297.4 psfTarget 1,240.6 daysTarget degree90%
  • Compression
  • Time response
  • Target

Loading crosses preconsolidation pressure. Both compression slopes contribute.

Calculation details
Stress pathOC → NC
Final effective stress3,592.3 psf
Final void ratio1.267
Recompression settlement1.25 in
Virgin compression settlement9.7 in
Longest drainage path Hdr10.499 ft
Target time factor Tv0.8481
Time to target1,240.63 days
Settlement at target9.85 in

Inputs

Clay layer and loading
Compression and drainage

Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.

Worked result

The void ratio decrease adds a Cr segment up to 110 kPa and a Cc segment above it.

  1. Add 2,005.002 psf to 1,587.293 psf to get 3,592.295 psf. The preconsolidation stress is 2,297.398 psf.
  2. Add 1.246 in of recompression and 9.701 in of virgin compression to get 10.947 in.
  3. Use Tv = 0.8481 and Hdr = 10.499 ft in TvHdr²/cv. This gives 1,240.6 days to 90% consolidation.
Settlement10.95 inOCR1.45Time to 50%287.8 daysTime to 90%1,240.6 days
Original case inputs
Layer thickness H₀20.99738 ft
Initial void ratio e₀1.37
Initial stress σ′₀1,587.293 psf
Preconsolidation σ′p2,297.39777 psf
Added stress Δσ′2,005.00169 psf
Compression index Cc0.47
Recompression Cr0.073
Drainage facesDouble
Consolidation rate cv0.07535 ft²/day
Target consolidation U90 %

Method & assumptions

  1. OCR = σ′p / σ′₀. Settlement is H₀/(1 + e₀) times the decrease in void ratio. Use Cr log₁₀(σ′/σ′₀) up to σ′p and Cc log₁₀(σ′/σ′p) beyond it.
  2. For normally consolidated clay, σ′p equals σ′₀ and the full stress increment follows Cc. Overconsolidated clay uses only Cr when final stress stays below or at σ′p.
  3. t = Tv Hdr² / cv. Hdr is H₀ for single drainage or H₀/2 for double drainage. Tv is found from Terzaghi’s average consolidation series and its short-time limit.
  4. Use a representative initial stress and added stress at the layer midpoint. The method assumes one homogeneous saturated layer, one-dimensional strain, sudden loading and constant cv. Compute separate layers when properties vary.