Worked example
Clay compressed past preconsolidation
A heavy fill increment pushes an overconsolidated clay through its yield stress.
Results
Edit inputs ↓- Settlement
- 10.95 in
- OCR
- 1.45
- Time to 50%
- 287.8 days
- Time to 90%
- 1,240.6 days
- Compression
- Time response
- Target
Loading crosses preconsolidation pressure. Both compression slopes contribute.
Calculation details
| Stress path | OC → NC |
|---|---|
| Final effective stress | 3,592.3 psf |
| Final void ratio | 1.267 |
| Recompression settlement | 1.25 in |
| Virgin compression settlement | 9.7 in |
| Longest drainage path Hdr | 10.499 ft |
| Target time factor Tv | 0.8481 |
| Time to target | 1,240.63 days |
| Settlement at target | 9.85 in |
GeotechSoilLab · Screening sheet · US customary
Clay compressed past preconsolidation
| Layer thickness H₀ | 20.99738 ft |
|---|---|
| Initial void ratio e₀ | 1.37 |
| Initial stress σ′₀ | 1,587.293 psf |
| Preconsolidation σ′p | 2,297.39777 psf |
| Added stress Δσ′ | 2,005.00169 psf |
| Compression index Cc | 0.47 |
| Recompression Cr | 0.073 |
| Drainage faces | Double |
| Consolidation rate cv | 0.07535 ft²/day |
| Target consolidation U | 90 % |
| Settlement | 10.95 in |
|---|---|
| OCR | 1.45 |
| Time to 50% | 287.8 days |
| Time to 90% | 1,240.6 days |
| Stress path | OC → NC |
| Final effective stress | 3,592.3 psf |
| Final void ratio | 1.267 |
| Recompression settlement | 1.25 in |
| Virgin compression settlement | 9.7 in |
| Longest drainage path Hdr | 10.499 ft |
| Target time factor Tv | 0.8481 |
| Time to target | 1,240.63 days |
| Settlement at target | 9.85 in |
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Worked result
The void ratio decrease adds a Cr segment up to 110 kPa and a Cc segment above it.
- Add 2,005.002 psf to 1,587.293 psf to get 3,592.295 psf. The preconsolidation stress is 2,297.398 psf.
- Add 1.246 in of recompression and 9.701 in of virgin compression to get 10.947 in.
- Use Tv = 0.8481 and Hdr = 10.499 ft in TvHdr²/cv. This gives 1,240.6 days to 90% consolidation.
Settlement10.95 inOCR1.45Time to 50%287.8 daysTime to 90%1,240.6 days
Original case inputs
| Layer thickness H₀ | 20.99738 ft |
|---|---|
| Initial void ratio e₀ | 1.37 |
| Initial stress σ′₀ | 1,587.293 psf |
| Preconsolidation σ′p | 2,297.39777 psf |
| Added stress Δσ′ | 2,005.00169 psf |
| Compression index Cc | 0.47 |
| Recompression Cr | 0.073 |
| Drainage faces | Double |
| Consolidation rate cv | 0.07535 ft²/day |
| Target consolidation U | 90 % |
Method & assumptions
- OCR = σ′p / σ′₀. Settlement is H₀/(1 + e₀) times the decrease in void ratio. Use Cr log₁₀(σ′/σ′₀) up to σ′p and Cc log₁₀(σ′/σ′p) beyond it.
- For normally consolidated clay, σ′p equals σ′₀ and the full stress increment follows Cc. Overconsolidated clay uses only Cr when final stress stays below or at σ′p.
- t = Tv Hdr² / cv. Hdr is H₀ for single drainage or H₀/2 for double drainage. Tv is found from Terzaghi’s average consolidation series and its short-time limit.
- Use a representative initial stress and added stress at the layer midpoint. The method assumes one homogeneous saturated layer, one-dimensional strain, sudden loading and constant cv. Compute separate layers when properties vary.
More worked examples
- Normally consolidated clay under fillAn embankment loads a normally consolidated clay layer bounded by permeable sand.
- Overconsolidated clay below yieldA modest foundation pressure increment leaves final stress below the soil’s prior maximum.
- Clay with single-sided drainageA clay layer is drained at its top and underlain by nearly impermeable material.
- Loading that reaches preconsolidation stressA staged load raises the effective stress exactly to the estimated preconsolidation stress.
- Time to 95% consolidationA staging study checks the estimated time to reach 95% primary consolidation for a thick layer.