Worked example · IEEE 81 · four-point methods

Conductive clay below engineered fill

Wenner and Schlumberger apparent resistivity with forward comparison against two assumed soil layers.

A proposed site has high-resistivity fill over clay. A larger potential field samples more of the conductive lower layer.

Resistivity falls with spacing

The trend follows the two assumed layers. The field reading is a separate apparent resistivity.

Measured apparent ρₐ
136.42 Ω·m
Model at field spacing
95.051 Ω·m
Reflection factor K
-0.83406
Geometric factor
44.005 m

Inputs

Field reading
m
m
Ω
Two-layer model
Ω·m
Ω·m
m

Four-pin survey & sounding curve

Live schematic
Measured ρₐ136.4 Ω·mModeled ρₐ95.05 Ω·mReflection K-0.8341Geometry44 mFOUR-PIN TRANSECTC1P1P2C2ρ₁ 420 Ω·mρ₂ 38 Ω·mAPPARENT ρ / Ω·m30.51235000.7770Pin spacing a / mObserved / modeled resistivity143.5%
The field lines are illustrative. The curve predicts a surface-electrode sounding for the entered two-layer profile.

Derived values & comparisons
Apparent / predicted ratio1.4352 ×
Model at 0.1× field spacing416.47 Ω·m
Model at 10× field spacing38.107 Ω·m
Upper / lower resistivity420 Ω·m / 38 Ω·m
Wenner depth multiplier1.0005 ×

Screening scope. Use a spacing series and independent traverses to estimate the layer parameters. Account for buried metal, moisture and survey uncertainty.

Try this. Increase the top-layer thickness and see how it moves the transition in the forward curve.

Calculation method

IEEE Std 81-2012 §7.2.3, equations 2–3 and Annex A. Wenner uses 4πaR/[1 + 2a/√(a² + 4b²) − a/√(a² + b²)]. At b = 0 the result is 2πaR.

Schlumberger uses π(L − a/2)(L + a/2)R/a, where L is half the current-electrode span and a is the potential-electrode spacing. This geometry assumes shallow pins.

For the forward model, K = (ρ₂ − ρ₁)/(ρ₂ + ρ₁). Each image at depth 2nh contributes with weight Kⁿ. The series is evaluated for the two electrode distances and normalized by the homogeneous-soil geometric factor. The forward curve sweeps 0.1× to 10× the field spacing with a fixed array shape.

IEEE Std 81-2025 supersedes the 2012 guide. The published 2012 equations are the reference for this worksheet. Review the adopted edition for field procedures.