Worked example · IEEE 81 · four-point methods

Resistive rock beneath topsoil

Wenner and Schlumberger apparent resistivity with forward comparison against two assumed soil layers.

A larger-spacing reading is being compared with a conductive topsoil layer over high-resistivity rock.

Resistivity rises with spacing

The trend follows the two assumed layers. The field reading is a separate apparent resistivity.

Measured apparent ρₐ
252.68 Ω·m
Model at field spacing
198.08 Ω·m
Reflection factor K
0.86813
Geometric factor
75.428 m

Inputs

Field reading
m
m
Ω
Two-layer model
Ω·m
Ω·m
m

Four-pin survey & sounding curve

Live schematic
Measured ρₐ252.7 Ω·mModeled ρₐ198.1 Ω·mReflection K0.8681Geometry75.43 mFOUR-PIN TRANSECTC1P1P2C2ρ₁ 60 Ω·mρ₂ 850 Ω·mAPPARENT ρ / Ω·m48.92028371.212120Pin spacing a / mObserved / modeled resistivity127.6%
The field lines are illustrative. The curve predicts a surface-electrode sounding for the entered two-layer profile.

Derived values & comparisons
Apparent / predicted ratio1.2756 ×
Model at 0.1× field spacing61.135 Ω·m
Model at 10× field spacing697.44 Ω·m
Upper / lower resistivity60 Ω·m / 850 Ω·m
Wenner depth multiplier1.0004 ×

Screening scope. Use a spacing series and independent traverses to estimate the layer parameters. Account for buried metal, moisture and survey uncertainty.

Try this. Reduce the assumed topsoil thickness and compare the forward response at the entered survey spacing.

Calculation method

IEEE Std 81-2012 §7.2.3, equations 2–3 and Annex A. Wenner uses 4πaR/[1 + 2a/√(a² + 4b²) − a/√(a² + b²)]. At b = 0 the result is 2πaR.

Schlumberger uses π(L − a/2)(L + a/2)R/a, where L is half the current-electrode span and a is the potential-electrode spacing. This geometry assumes shallow pins.

For the forward model, K = (ρ₂ − ρ₁)/(ρ₂ + ρ₁). Each image at depth 2nh contributes with weight Kⁿ. The series is evaluated for the two electrode distances and normalized by the homogeneous-soil geometric factor. The forward curve sweeps 0.1× to 10× the field spacing with a fixed array shape.

IEEE Std 81-2025 supersedes the 2012 guide. The published 2012 equations are the reference for this worksheet. Review the adopted edition for field procedures.

Standards and model assumptions