Starting estimate
The bed can hold the calculated volume in one trip, but the load weighs more than the entered payload. The payload estimate requires two trips.
- Bulk volume to order
- 9.33 yd³
- Estimated loose weight
- 12.6 US tons
- Estimated truckloads
- 2
How the estimate works
- Find the footprint area and multiply it by the finished material depth. For irregular yard sections, add measured areas and enter the total as Known area.
- Divide installed volume by the fraction left after compaction. Multiply that loose volume by one plus the order allowance.
- Multiply the order volume by loose density for weight. Round up bags and check both volume and payload when counting delivery loads.
Questions and answers
Why does the 9⅓ yd³ sand order need two truckloads with a 10 yd³ bed?
It weighs an estimated 12.6 US tons. The stated 7 US ton payload is the limiting factor, so two trips are needed.
What if wet sand arrives heavier than the 100 lb/ft³ assumption?
Enter the current quoted density and check the supplier’s legal payload for the vehicle on your route. The planning estimate changes with density.