Worked example

Crushed limestone for a 20 × 12 ft parking pad

A supplier quotes #57 crushed limestone by the ton. Estimate a 3 in finished layer over a 20 × 12 ft pad with 10% compaction loss and a 5% order allowance.

Project inputs

Footprint and depth
ft
ft
in
Material and order
lb/ft³
Preset densities are estimates. Use the supplier’s loose bulk density when known.
%
The fraction of loose volume lost as material settles or compacts.
%
ft³/bag
yd³
US tons

Material & layout estimate

Bulk volume to order

2.59 yd³
Order volume in alternate units
1.98 m³
Estimated loose weight
3.33 US tons
Metric equivalent weight
3.02 t
Whole bags
140
Estimated truckloads
1
Coverage area
240 ft²
Finished volume
2.22 yd³
Loose volume before allowance
2.47 yd³

Payload limits the load estimate. Confirm both limits and loose density with the supplier.

Material depth & delivery loads Schematic
Material depth & delivery loadsBulk volume to order: 2.59 yd³. Order volume in alternate units: 1.98 m³. Estimated loose weight: 3.33 US tons. Metric equivalent weight: 3.02 t FOOTPRINT240 ft²SECTION3 in finished depthORDER & LOADS2.59 yd³3.33 US tons loose weightBed volumePayload1 truckloads

Starting estimate

The 60 ft³ installed layer needs 70 ft³ loose with both adjustments. Confirm whether your supplier rounds bulk delivery by volume or weight.

Bulk volume to order
2.59 yd³
Estimated loose weight
3.33 US tons
Whole bags
140

How the estimate works

  1. Find the footprint area and multiply it by the finished material depth. For irregular yard sections, add measured areas and enter the total as Known area.
  2. Divide installed volume by the fraction left after compaction. Multiply that loose volume by one plus the order allowance.
  3. Multiply the order volume by loose density for weight. Round up bags and check both volume and payload when counting delivery loads.

Questions and answers

What area does the 20 × 12 ft parking pad cover?

The rectangular footprint is 240 square feet. A 3-inch layer uses one quarter of a cubic foot per square foot before order allowances.

Why does the parking pad show fewer cubic yards than US tons?

Cubic yards measure volume and US tons measure weight. At 95 lb/ft³, a cubic yard weighs about 1.28 US tons.